Introducing our Safe Work Method Statement (SWMS) Template for Mobile Crusher. This absolute rippa is brimming with the kind of features that make safety compliance a breeze:
Pre-filled and Comprehensive
No need to start from scratch, mate! Our SWMS template comes packed with all the requisite details pre-filled. It’s extensive, covering all aspects of mobile crusher operations.
Fully editable and customisable in Microsoft Word format
Every site has its quirks, we get it. That’s why we’ve made our templates completely editable and customisable in Word. Change up whatever you like to suit your specific needs.
Includes the scope of the project and the project details
It’s vital stuff, so we’ve included dedicated sections for the project scope and particular details associated with it. Add, modify, or remove as it suits you, no worries.
Checklist of any high risk machinery on site
Safety first, always! We’ve got specially designated spaces for listing all those potentially hazardous machines. Staying alert couldn’t get easier than this.
Space for recording any staff training
Training is key. Make note of all training provided to your crew right here in the template to ensure they’re equipped with the right knowledge.
Before and after risk ratings
A handy tool for identifying risk levels both before and after control measures are put in place. Helps keep things as safe as houses!
Resources for use of legislative references
References to legislation are important. Use this template to keep everything aboard and above board.
All PPE required are included
We’re big on PPE. The SWMS template lists all protective gears required, so each of your blokes can be safe at work.
Risk assessment and risk assessment matrix
Comprehensive risk assessments and matrices for super practical hazard tracking. Keeps things from going pear-shaped on the site.
Checklist ensures all requirements have been covered when implementing the SWMS
Makes sure you’ve got all your ducks in a row before kick-off by using the integrated SWMS checklist.
Sign off page for all workers and responsible persons
Keep everyone accountable with our sign-off page – perfect for ensuring everyone is on the same page, literally and figuratively!
Easy to use, easy to customise
Straightforward design, clear language — letting you get on with doing what you do best.
Suitable for large contracts and Tenders, including tier 1 contractual work
Rigorously designed to meet even the stringent demands of the biggest contracts and tenders. If it’s good enough for the top tier, you know you’re onto a winner.
Quick delivery by email
No stuffin’ around here! Accessed right through your inbox without delay.So, there you have it – but remember, while we’re here to help, safety is ultimately in your hands! Stay safe out there.
The Mobile Crusher Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Slips
- trips and falls
- Exposure to dust
- 2. Inspection
- Engine running
- Operating controls
- 3. Loading Process
- Crushing hazard
- Noise exposure
- Dust Inhalation
- 4. Positioning
- Being struck by moving vehicle
- Falling Objects
- 5. Operation Control
- Electrical faults
- Fire from fuel leaks
- 6. Maintenance
- Falls from height
- Body parts caught in machinery
- 7. Cleaning Up
- Exposure to chemicals
- Skin contact with hazardous substances
- 8. Emergency Procedures
- Fire hazard
- Inadequate first-aid kit
- 9. Waste Disposal
- Exposure to harmful bacteria
- Lacerations from sharp objects
- 10. Shutdown Process
- Equipment malfunction
- Failure to secure parts
- 11. Packing Up
- Manual handling injuries
- Slips
- trips and falls
- 12. Transporting Crusher
- Road accidents
- Vehicle malfunctions
- 13. Site Decommission
- Environmental hazards
- Irresponsible waste disposal
- 14. Incident Reporting
- No proper communication
- Delay in reporting
- 15. Exit Procedure
- Not following safety procedures
- Accidents during exit process
- 16. Equipment Check
- Faulty equipment
- Missing safety gear
- 17. Post Work Review
- No feedback collection
- Miscommunication
- 18. Refuelling
- Fire from fuel spills
- Chemical exposure
- 19. Documentation
- Lost papers
- Inaccurate details in documents
- 20. Storage
- Crushing injuries
- Manual handling injuries
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Mobile Crusher Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


