Introducing our Safe Work Method Statement (SWMS) Template for Metal Wire Mesh Weaving Machine, meticulously designed to enhance safety measures in your workplace:
- Pre-filled and Comprehensive: This template is not just a piece of paper but a comprehensive tool filled with vital information, ensuring you don’t start from scratch. It provides detailed content aligned with standard industry procedures for the operation of a metal wire mesh weaving machine.
- Fully editable and customisable in Microsoft Word format: Edit and adjust as per your business requirements. With its user-friendly Microsoft Word format, this template offers high flexibility for seamless adaptation to any workplace scenario.
- Includes the scope of the project and project details: This feature allows users to input important details related to the specific job or task at hand, aiding in the planning and execution phase.
- Incorporates checklist of High Risk Machinery on site: With this feature, management can proactively identify any potentially hazardous machinery on site and take immediate action.
- Space for recording staff training: Keep track of your team’s progress and ensure they are equipped with relevant skills necessary for operation and safety protocols.
- Before and after risk ratings included: Track and comprehend possible risks both before and after implementing safety measures. This will allow stakeholders to understand the effectiveness of precautions taken.
- Resources for use of legislative references: Our template provides resourceful links and tips to key legislations and regulations regarding workplace safety precautions, providing users with a solid foundation based on legal requirements.
- Includes all PPE required: Lists of required personal protective equipment for the task is outlined clearly in the document, ensuring full compliance and protection of workers.
- Risk assessment and risk assessment matrix: This feature guides management in identifying and analysing potential risks, thus reducing workplace accidents.
- Checklist for requirement fulfilment: An exhaustive checklist covering all SWMS requirements will ensure nothing is overlooked when implementing this crucial safety measure.
- Sign off page for all responsible persons included: Get all concerned parties on one page. Literally. This accountability snapshot ensures everyone knows their role and responsibilities for a safer work environment.
- User-friendly and uncomplicated design: Trade people like it simple and so do we. No complicated jargon – instead a user-friendly document that’s easy to navigate.
- Suitable for large contracts and Tenders: With its comprehensive detailing, this template is highly suitable for major contracts and tenders, even fulfilling tier 1 contract standards.
- Quick email delivery: Time is gold and we respect yours. Upon purchase, the template will be sent pronto to your inbox.
The right choice from the get-go, getting your hands on this SWMS template could mean a safer, more precisely organised and highly productive workspace. Now, that’s something worth having, isn’t it mate?
The Metal Wire Mesh Weaving Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Incorrect setup
- Inadequate training
- 2. Machine Start up
- Mechanical failure
- Electric shock from faulty wiring
- 3. Wire Feeding
- Wire entanglement
- sharp wire ends
- manual handling injuries
- 4. Weaving Operation
- Caught in/between moving parts
- continuous loud noise exposure
- 5. Quality Check
- Eye strain
- repetitive motion injuries
- 6. Wire cutting
- Flying debris
- sharp cut ends
- extreme temperatures from hot wires
- 7. Bundling and Storage
- Heavy lifting
- improper stacking
- 8. Machine Maintenance
- Unexpected machine movement
- chemical exposure
- 9. Machine cleaning
- Exposure to harmful residues
- slips/trips due to wet surface
- 10. Emergency Stop & Reset
- Moving parts during reset
- electric shock from emergency stop button
- 11. Waste Disposal
- Manual handling injuries
- exposure to harmful substances
- 12. Shut Down
- Unintentional machine operation
- electrical fires
- 13. Record Keeping
- Filling incorrectly resulting in misleading data
- 14. Reviewing Procedures
- Inability to comprehend instructions leading to accidents and errors
- 15. Training New Operators
- Accidents during demonstration
- lack of understanding in trainees
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Metal Wire Mesh Weaving Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


