Metal Tube Bending Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Tube Bending Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Tube Bending Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Safe Work Method Statement Template for Metal Tube Bending Machine:

  • Pre-filled and Comprehensive: This template comes pre-filled, providing you with a comprehensive format. It’s detailed enough to cover a majority of generic safety considerations, saving your time fill out repetitive information.
  • Fully editable and customisable in Microsoft Word format: We understand that every project is unique, so we have made the template fully editable in Microsoft Word format. This means you can easily tailor it specifically to your project’s needs.
  • Includes the scope of the project and the project details: The space provided in the template for you to outline these key details are strategically placed to guarantee its visibility. You don’t have to worry about forgetting or misplacing this essential project information.
  • Includes checklist of any high risk machinery on site: Keeping track of high-risk machinery can be a daunting task. However, with our integrated checklist, you can rest assured that all machinery will be accounted for.
  • Includes space for recording any staff training: Staff training is invaluable in workplace safety. That’s why this template includes room to document completed safety training sessions .
  • Includes before and after risk ratings: Easily record and compare risk levels before and after implementing safety measures using our straightforward rating system. You’ll find this feature incredibly useful in monitoring progress and justifying your initiatives.
  • Includes resources for use of legislative references: Staying abreast of new legislation and rules can be tricky. But not to worry, we’ve included resources you can utilise to access relevant legislative references.
  • Includes all PPE required: The importance of personal protective equipment can never be overstated. Ensure you’re comprehensively covered with our convenient listing of all necessary PPE.
  • Includes risk assessment and risk assessment matrix: This tool will allow you to identify and assess potential safety hazards quickly. By using this matrix, you can systematically organise risks according to their severity and likelihood.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: The last thing you want is a missed crucial requirement. Keep track of implemented requirements with this dedicated checklist. It’s like having your very own diligent personal assistant.
  • Includes sign off page for all workers and responsible persons: Accountability matters in work health and safety. Therefore, we’ve incorporated a formal signing-off section for both workers and those in position of responsibility.
  • Easy to use, easy to customise: Despite its comprehensive nature, this template is user-friendly. Its design encourages easy customisation and implementation.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Regardless of your project’s scale, this template fits the bill. Whether it’s a small contract or a massive tender including tier 1, you can count on this template.
  • Quick delivery by email: There’s no need to wait around! Upon purchase, your template will be delivered straight to your inbox, ready for immediate use.

The Metal Tube Bending Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Improper PPE
  • 2. Machine Set-up
    • Moving parts
    • Electrical shock
  • 3. Material Loading
    • Manual lifting
    • Slips/falls
  • 4. Operation Start
    • Loose clothing/items
    • Noise exposure
  • 5. Tube Bending
    • Caught in machinery
    • Overexertion
  • 6. Quality Control
    • Eye strain
    • Repetitive motion
  • 7. Unloading Finished Product
    • Manual handling
    • Slippery surfaces
  • 8. Machine Maintenance
    • Electrical hazards
    • Chemical exposure
  • 9. Waste Disposal
    • Sharp metal waste
    • Chemical exposure
  • 10. Shift End Checks
    • Incorrect shutdown procedure
    • Forgotten maintenance steps
  • 11. Emergency Procedure
    • Lack of clear procedures
    • Inadequate training
  • 12. Clean up area
    • Rubbish left around
    • Spillages
  • 13. Report any issues
    • Poor communication
    • Missed hazards
  • 14. Toolbox talks
    • Disrespectful behaviour
    • No attention
  • 15. Review SWMS
    • Outdated information
    • Misunderstanding guidelines

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Tube Bending Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart