Metal Swaging Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Swaging Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Swaging Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Product Description: Safe Work Method Statement Template for Metal Swaging Machine

  • Pre-filled and Comprehensive: This high-quality template comes pre-filled with all critical information, saving you valuable time. It’s not just blank spaces; it’s a complete document that covers comprehensive details about your work procedures.
  • Fully editable and customisable in Microsoft Word format: Our Yer Templates are fully compatible with Microsoft Word, meaning you can easily edit and customise, to suit your project requirements.
  • Includes the scope of the project and the project details: Every project is different, and this template provides space for you to specify the scope and other details unique to your specific task.
  • Includes checklist of any high risk machinery on site: To ensure safety at its best, our template includes a thorough checklist of high-risk machinery involved, aiding your team in maintaining vigilance throughout the operation.
  • Includes space for recording any staff training: Record all necessary staff training sessions related to the use of the metal swaging machine. This ensures all operatives are fully trained and equipped to handle the machinery responsibly.
  • Includes before and after risk ratings: Integrated within are dedicated sections where you can record risk ratings both before and after implementing control measures, clearly demonstrating the effectiveness of your risk management strategies.
  • Includes resources for use of legislative references: Stay compliant by utilising our available resources that outline the necessary legislative references.
  • Includes all PPE required: Personal Protective Equipment (PPE) is crucial while using High-Risk machinery. Our template has a dedicated section where you can list all the necessary PPE required for the specific job.
  • Includes risk assessment and risk assessment matrix: The included comprehensive risk assessment area and easy-to-understand matrix allow for clear identification, rating, and control of existing and potential job hazards.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: For peace of mind and to ensure all bases are effectively covered, our diligent checklist ensures you’ve gathered whatever you need whilst implementing your Safe Work Method Statements.
  • Includes sign off page for all workers and responsible persons: To ensure that everyone involved in the project comprehends the SWMS, we have included a sign-off page for every worker and responsible person.
  • Easy to use, easy to customise: We’ve made our templates user-friendly, so they’re easily understandable by anyone in your team. You don’t need to be an IT wizard to fill them in!
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Whether you’re working on a large contract or preparing a tender, our SWMS template is robust enough to help you present your commitment to Workplace Health and Safety at all levels of operation.
  • Quick delivery by email: There’s no waiting around for snail mail here. After purchase, your SWMS template will be delivered swiftly via email because we value your time just as much as we do your safety.

The Metal Swaging Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Accidental falls
    • Uncontrolled release of energy
  • 2. Machine Setup
    • Manual handling injuries
    • Entanglement risks
  • 3. Inspection and Testing
    • Electrical risks
    • Hazardous noise
  • 4. Operation Start-up
    • Unplanned machine operation
    • Cutting or shearing
  • 5. Regular Use
    • Falls from heights
    • Exposure to hazardous substances
  • 6. Machine Shutdown
    • Residual energy
    • Trapping risks
  • 7. Cleaning
    • Exposure to hazardous chemicals
    • Slip
    • trip and fall
  • 8. Maintenance
    • Electrocution risks
    • Fires due to hot work
  • 9. Emergency Procedures
    • Fire and explosion
    • Inadequate ventilation
  • 10. Training
    • Lack of understanding
    • Providing incorrect information
  • 11. Personal Protective Equipment
    • Inadequate PPE ,Improper use of PPE
  • 12. Noise Management
    • Hearing loss,Tinnitus
  • 13. Dust and Fume Management
    • Respiratory conditions,Eye irritations
  • 14. Waste Management
    • Environmental damage,Negative health effects
  • 15. Pack up & Site Clean Up
    • Risks associated with manual lifting,Slip
    • trip and fatal hazard

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Swaging Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart