Product Description: Safe Work Method Statement Template for Metal Swaging Machine
- Pre-filled and Comprehensive: This high-quality template comes pre-filled with all critical information, saving you valuable time. It’s not just blank spaces; it’s a complete document that covers comprehensive details about your work procedures.
- Fully editable and customisable in Microsoft Word format: Our Yer Templates are fully compatible with Microsoft Word, meaning you can easily edit and customise, to suit your project requirements.
- Includes the scope of the project and the project details: Every project is different, and this template provides space for you to specify the scope and other details unique to your specific task.
- Includes checklist of any high risk machinery on site: To ensure safety at its best, our template includes a thorough checklist of high-risk machinery involved, aiding your team in maintaining vigilance throughout the operation.
- Includes space for recording any staff training: Record all necessary staff training sessions related to the use of the metal swaging machine. This ensures all operatives are fully trained and equipped to handle the machinery responsibly.
- Includes before and after risk ratings: Integrated within are dedicated sections where you can record risk ratings both before and after implementing control measures, clearly demonstrating the effectiveness of your risk management strategies.
- Includes resources for use of legislative references: Stay compliant by utilising our available resources that outline the necessary legislative references.
- Includes all PPE required: Personal Protective Equipment (PPE) is crucial while using High-Risk machinery. Our template has a dedicated section where you can list all the necessary PPE required for the specific job.
- Includes risk assessment and risk assessment matrix: The included comprehensive risk assessment area and easy-to-understand matrix allow for clear identification, rating, and control of existing and potential job hazards.
- Includes a checklist to ensure all requirements have been covered when implementing the SWMS: For peace of mind and to ensure all bases are effectively covered, our diligent checklist ensures you’ve gathered whatever you need whilst implementing your Safe Work Method Statements.
- Includes sign off page for all workers and responsible persons: To ensure that everyone involved in the project comprehends the SWMS, we have included a sign-off page for every worker and responsible person.
- Easy to use, easy to customise: We’ve made our templates user-friendly, so they’re easily understandable by anyone in your team. You don’t need to be an IT wizard to fill them in!
- Suitable for large contracts and Tenders, including tier 1 contractual work: Whether you’re working on a large contract or preparing a tender, our SWMS template is robust enough to help you present your commitment to Workplace Health and Safety at all levels of operation.
- Quick delivery by email: There’s no waiting around for snail mail here. After purchase, your SWMS template will be delivered swiftly via email because we value your time just as much as we do your safety.
The Metal Swaging Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Accidental falls
- Uncontrolled release of energy
- 2. Machine Setup
- Manual handling injuries
- Entanglement risks
- 3. Inspection and Testing
- Electrical risks
- Hazardous noise
- 4. Operation Start-up
- Unplanned machine operation
- Cutting or shearing
- 5. Regular Use
- Falls from heights
- Exposure to hazardous substances
- 6. Machine Shutdown
- Residual energy
- Trapping risks
- 7. Cleaning
- Exposure to hazardous chemicals
- Slip
- trip and fall
- 8. Maintenance
- Electrocution risks
- Fires due to hot work
- 9. Emergency Procedures
- Fire and explosion
- Inadequate ventilation
- 10. Training
- Lack of understanding
- Providing incorrect information
- 11. Personal Protective Equipment
- Inadequate PPE ,Improper use of PPE
- 12. Noise Management
- Hearing loss,Tinnitus
- 13. Dust and Fume Management
- Respiratory conditions,Eye irritations
- 14. Waste Management
- Environmental damage,Negative health effects
- 15. Pack up & Site Clean Up
- Risks associated with manual lifting,Slip
- trip and fatal hazard
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Metal Swaging Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


