Metal Reamer Tool Safe Work Method Statement (SWMS)

$96.80

The Metal Reamer Tool Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Metal Reamer Tool Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Safe Work Method Statement Template for Metal Reamer Tool

G’day, and welcome to our well-crafted Safe Work Method Statement Template (SWMS) designed specifically for the use of a Metal Reamer Tool.

  • Pre-filled and Comprehensive: To save you time and effort, we’ve already filled in the necessary details. However, feel free to add, omit or change according to what your project requires. It’s not just comprehensive, it’s also flexible!
  • Fully editable and customisable in Microsoft Word format: Want to make some changes? No worries. Our template can be edited easily using Microsoft Word. You can modify it to meet your specific needs and work environment.
  • Includes the scope of the project and the project details: The SWMS doesn’t just list down tasks — it outlines what your project is all about right from its objective to every small detail associated with it.
  • Includes checklist of any high-risk machinery on site: The safety of your workers is of prime importance, and taking into account the potential hazards that exist, we’ve included a thorough checklist of all high-risk machinery.
  • Includes space for recording any staff training: Our template acknowledges that your workers need specific training to handle tools safely. We’ve included a section where you can record any essential training completed to ensure a competent workforce.
  • Includes before and after risk ratings: This important feature helps you understand the level of risk before and after control measures are implemented, reinforcing the effectiveness of your safety measures.
  • Includes resources for use of legislative references: Staying compliant is not an option, so we’ve included relevant legislative references to guide you adhere to the appropriate regulations in your jurisdiction.
  • Includes all PPE required: Recognising that proper equipment is key to safe work, our template lists all the Personal Protective Equipment (PPE) needed for the job. By doing so, we’re helping to keep everybody involved safe as houses.
  • Includes risk assessment and risk assessment matrix: To help quantify and prioritise risks, our template includes a straightforward risk assessment and risk assessment matrix.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: The handy-dandy checklist at the end ensures that no step is overlooked during the implementation of your SWMS.
  • Includes sign off page for all workers and responsible persons: Accountability is crucial, mate! Therefore, we’ve included a sign-off page where all workers and responsible persons can acknowledge understanding and acceptance of the tasks and safety procedures within the SWMS.
  • Easy to use, easy to customise: Not the best with paperwork? Don’t worry, our SWMS template is user-friendly and can be easily tailored to your needs without any fuss. It’s as straightforward as a kangaroo’s hop!
  • Suitable for large contracts and Tenders, including tier 1 contractual work: We understand size does matter in some cases. Our SWMS Template isn’t just good for small jobs – it’s suitable for the big stuff, including tier 1 contractual work.
  • Quick delivery by email: No standing around waiting for this fellah. Once purchased, we’ll quickly send the template through to your registered email address. Efficiency is key!

The Safe Work Method Statement Template for Metal Reamer Tool is your straightforward safety pal. Our aim is to assist you in ensuring the wellbeing of your employees and the successful completion of your projects, while staying compliant with safety regulations.

Cheers and stay safe out there!


The Metal Reamer Tool Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Lack of equipment safety training
    • Insufficient inspection
  • 2. Tool Selection
    • Use of inappropriate tool
    • Lack of tool maintenance
  • 3. Operational Setup
    • Improper workspace setup
    • Inadequate lighting
  • 4. Material Handling
    • Manual handling injury
    • Trip hazards
  • 5. Machine Operation
    • Excessive noise
    • Flying debris
  • 6. Coolant use
    • Chemical exposure
    • Slips due to spillage
  • 7. Cleanup Procedure
    • Inadequate waste disposal methods
    • Exposure to sharp objects
  • 8. Maintenance tasks
    • Poor isolation of energy supplies
    • Lack of proper PPE usage
  • 9. Machine Adjustment
    • Mechanical hazards
    • Unexpected start-up
  • 10. Material Disposal
    • Improper lifting procedures
    • Incorrect disposal of metal shards
  • 11. Emergency Procedures
    • Inadequate emergency exit access
    • Lack of trained personnel for emergencies
  • 12. Tool Storage
    • Improper storage causing trip hazards
    • Accessibility issues leading to overreaching injuries
  • 13. Shift Changeover
    • Lack of communication in shift changeover resulting in misunderstandings around machine status
  • 14. Quality Checks
    • Distraction due to multitasking
    • Stress from quality pressure
  • 15. Shutdown Procedure
    • Electrical hazards during shutdown
    • Failure to follow procedures causing mechanical hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Reamer Tool Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart