Metal Grinding Disc Safe Work Method Statement (SWMS)

$96.80

The Metal Grinding Disc Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Grinding Disc Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing the Safe Work Method Statement Template for Metal Grinding Disc – a practical, ready-to-go solution designed to make your work process safer and more organised. This one-of-a-kind template comes packed with a variety of essential features:

  • Pre-filled and Comprehensive: To save you time and effort, this template is thoughtfully pre-filled with standard industry details. It provides a comprehensive view of processes, increasing the possibility of creating a safe working environment.
  • Fully editable and customisable in Microsoft Word format: Conveniently edit, tweak, and tailor the information to fit your company’s specific requirements – all using Microsoft Word!
  • Includes the scope of the project and the project details: Every pertinent detail regarding the project’s scope and specific details are covered. That means it helps in keeping everyone on the same page, ensuring clear understanding among all workers about their respective roles.
  • Includes checklist of any high risk machinery on site: The template features a strategically itemised checklist that identifies high-risk machinery present, providing an added layer of safety against possible hazards.
  • Includes space for recording any staff training: Keeping track of who’s been trained to do what can be tricky – but not with our convenient record-keeping spaces!
  • Includes before and after risk ratings: The template allows benchmarking potential risks prior to work commencement, and also post-notification statistics for comparison purposes.
  • Includes resources for use of legislative references: Carry out your tasks while abiding by legislation regulations. Our template includes resources to keep you up-to-date and compliant.
  • Includes all PPE required: Neglect no precautions with our template. It includes all the necessary Personal Protective Equipment (PPE) required for the job.
  • Includes risk assessment and risk assessment matrix: Understand and manage probable risks better with our included comprehensive risk assessment capable of remarkably improving on-site safety.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Oversee every requirement and ensure nothing slips through the cracks when implementing the Safe Work Method Statement with our checklist.
  • Includes sign-off page for all workers and responsible persons: Authentication matters, and so we’ve included a sign-off page. It helps by ensuring every individual involved acknowledges understanding and compliance with the project’s safety procedures.
  • Easy to use, easy to customise: We’ve designed this template with you in mind, ensuring that it’s user-friendly and straightforward to modify to your heart’s content.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Whether it’s a small gig or a large contract, this template does not discriminate! It suits all sizes of operations, including rigorous tier 1 contractual work.
  • Quick delivery by email: Don’t fancy waiting around for delivery? No problem – we’ll promptly deliver your template straight to your inbox!

Remember, trades folks, while we’ve put great effort into crafting the above features, we cannot provide guarantees as unforeseen risks are part-and-parcel of life. But we’re here to help make it easier to produce safer work environments!


The Metal Grinding Disc Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Physical injury from handling heavy equipment
    • improper use of protective gear
  • 2. Checking Equipment
    • Equipment failure
    • electricity related hazards
  • 3. Setting up Workspace
    • Slips and trips due to unclean or cluttered workspace
    • fire hazard from improper storage of flammable materials
  • 4. Inspecting Disc
    • Explosion hazards from damaged disc
    • cut injuries from sharp edges
  • 5. Mounting the Disc
    • Incorrect mounting risks disc flying off
    • hand injuries while mounting
  • 6. Pre-use Check
    • Equipment failure
    • electrical hazards
  • 7. Working with the Grinder
    • Eye damage from sparks/dust
    • hearing damage from noise
    • inhalation of dusts/fumes
  • 8. Moving the Disc Grinder Around
    • Trips and falls
    • dropping grinder causing foot injury
  • 9. Cleaning up
    • Injury from improper lifting
    • slips and trips from unclean workspace
  • 10. Storing the Grinder
    • Improper storage leading to damage or fire
    • tripping over poorly stored equipment
  • 11. Maintenance of the Grinder
    • Injury while performing maintenance tasks
    • exposure to harmful substances
  • 12. Regular Inspection of the Grinder
    • Electrical hazards
    • risk of using poorly maintained equipment
  • 13. Discarding used Grinders/Discs
    • Exposure to sharp edges/window fragments
    • incorrect disposal may lead to environmental hazard
  • 14. Emergency Drills
    • Inadequate practice leads to panic in real situations
    • injury while performing drills
  • 15. Equipment Servicing & Repair
    • Injury from contact with hazardous parts or substances
    • electrical hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Grinding Disc Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart