Metal Fiber Laser Cutting Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Fiber Laser Cutting Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Fiber Laser Cutting Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:
Safe Work Method Statement (SWMS) Template for Metal Fibre Laser Cutting Machine:

The SWMS template is a top-notch toolkit designed with the safety of your worksite in mind. Here’s a rundown of its fantastic elements:

1. Pre-filled and Comprehensive: This time-saving aspect means you no longer have to start from scratch. It includes crucial details such as methodology, responsibilities and step by step process to make it complete and easy to understand.

2. Fully Editable and Customisable in Microsoft Word format: Love tweaking stuff? Great! This feature lets you easily modify the template to align with your work requirements or company policy, all within the familiar workspace of Microsoft Word.

3. Includes the Scope of the Project and The Project Details: Every project has unique challenges. This feature helps capture pertinent specifics, making sure your unique project needs are catered for on paper, before they become risks.

4. Incorporates Checklists for High Risk Machinery On-site: We’ve made it simple for you to identify and track high risk machines at your site, helping minimise potential hazards.

5. Space for Recording Staff Training: A well-trained staff is a safe staff! Our space for recording training ensures any gaps in essential employee education are readily apparent.

6. Includes Before and After Risk Ratings: Manage risks effectively by tracking them both, before and after control measures are put in place.

7. Resources for Use of Legislative References: Stay compliant by having easy access to legislative references right within the document itself.

8. Lists All PPE Required: Personal Protective Equipment is paramount – so we do not leave it to chance. A list of all necessary PPE is included.

9. Risk Assessment and Risk Assessment Matrix: SWMS main feature – it lets you identify risks, control them and track the progress. No more rough guesses on safety hazards.

10. Checklist for SWMS Requirements: A handy checklist ensures that nothing slips through the cracks when implementing your Safe Work Method Statement.

11. Includes a Sign Off Page for all Workers and Responsible Persons: Accountability is key – and this features ensures it’s easy to track who has acknowledged the SWMS.

12. Easy-to-use, Easy-to-Customise Interface: Even if you’re not a tech-wiz, our simple design makes editing and personalisation a breeze.

13. Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Our template is designed to match professional standards, fitting perfectly even for larger contracts and high-tier work orders.

14. Quick Delivery by Email: Because we value your time, the template will be delivered swiftly via email after your order.

You don’t need fancy words or shiny icons to see how having this tool in your safety management arsenal can make a real difference at your workplace.


The Metal Fiber Laser Cutting Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Poor setup
    • incorrect measurements
    • inadequate training
  • 2. Machine Setup
    • Incorrect alignment
    • misuse of tools
    • faulty equipment
  • 3. Material Loading
    • Manual handling injuries
    • pinch points
    • dropped materials
  • 4. Machine Operation
    • Unauthorised access
    • entanglement in moving parts
    • noise
  • 5. Maintenance
    • Electric shock
    • exposure to hazardous substances
    • poor ventilation
  • 6. Cleaning
    • Cutting injuries
    • exposure to chemicals
    • slip or trip hazards
  • 7. Material Unloading
    • Manual handling injuries
    • unstable stacks
    • dropped materials
  • 8. Inspection
    • Missed defects
    • incorrect measurements
    • lack of focus
  • 9. Storage
    • Improper stacking
    • inappropriate storage location
    • heavy lifting
  • 10. Emergency Procedures
    • Inadequate training
    • confusion during evacuation
    • obstructed routes
  • 11. Waste Management
    • Biohazard exposure
    • incorrect disposal methods
    • chemical exposure
  • 12. Shut Down Procedure
    • Faulty equipment
    • lack of understanding of procedures
    • neglecting lockout/tagout
  • 13. Communication & Coordination
    • Misunderstanding instructions
    • lack of coordination
    • ineffective communication
  • 14. Manual Handling Techniques
    • Muscle strains
    • repetitive strain injuries
    • poor ergonomics
  • 15. Power and Hand Tools Use
    • Incorrect use
    • electrical faults
    • flying debris
  • 16. Personal Protective Equipment PPE Use
    • Lack of training
    • improper use
    • unsuitable PPE
  • 17. Regular Machine Maintenance
    • Neglected regular checks
    • overlooked wear and tear
    • ignored minor faults
  • 18. Reporting of Incidents & Hazards
    • Fear of reporting
    • unaware of procedures
    • inadequate documenting
  • 19. Safety Induction & Training
    • Insufficient training
    • lack of refresher courses
    • unskilled workers
  • 20. End of Day Procedures
    • Rushing to finish
    • neglecting shut down procedure
    • overlook cleaning

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Fiber Laser Cutting Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart