Metal Cnc Waterjet Cutting Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Cnc Waterjet Cutting Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Cnc Waterjet Cutting Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Safe Work Method Statement Template for Metal CNC Waterjet Cutting Machine

This Safe Work Method Statement (SWMS) template is a comprehensive resource tailor made for the unique requirements of metal CNC waterjet cutting operations. Some of its top features include:

  • Pre-filled and Comprehensive: This template comes with pre-filled fields that reflect industry standards. It aims to help businesses address all relevant areas of safety without having to start from scratch, saving you precious time.
  • Fully Editable and Customisable: The SWMS template is fully customisable in Microsoft Word format. This means that it can be edited to match the specifics of your business needs, providing flexibility while maintaining compliance with WHS guidelines.
  • Project Details: The SWMS template includes special sections to record in-depth project details including the scope and employees involved in the project. This helps to ensure everyone understands their roles and responsibilities in keeping the workplace safe.
  • Machinery Checklist: A checklist for any high risk machinery on site provides an easy reference for operators and enhances preventative maintenance programs. This feature is aimed at reducing machine-related mishaps in the workshop.
  • Staff Training Record: To underscore the significance of training, there’s a dedicated section to record what training has been provided for staff and when it took place. This provides a clear curriculum roadmap and tracks completed training programs.
  • Before and After Risk Ratings: Quickly identify potential hazards and take preventive measures before operations commence with the built-in risk assessment tools. Evaluating the effectiveness of these measures becomes equally straightforward with after operation assessments.
  • Resources for Use of Legislative References: Keeping up with legislative references can be tricky but our template makes it easier. We’ve included resources to familiarise yourself with current WHS regulations which can be referenced in the document as needed.
  • All PPE Required: The SWMS template includes a section listing all personal protective equipment (PPE) recommended for safe operation, making sure workers are properly outfitted to reduce the risk of injury.
  • Risk Assessment: Integral to any SWMS is the Risk Assessment Matrix, allowing for risks to be categorized and prioritized for mitigation plans. This helps ensure that all potential hazards are considered and accounted for.
  • Checklist: For ease-of-use, a user-friendly checklist ensures that all necessary considerations have been made before implementing the SWMS. This facilitates adherence and decreases possibility of oversight.
  • Sign Off Page: A sign off segment is included to confirm participation and understanding from all involved parties.
  • User Friendly: The template is structured to be straightforward and easy to fill out without compromising on details. This makes it ideal for trades persons who may not want to navigate overly complex documents.
  • Suitable for Large Contractual Work: Designed in compliance with industry best practices, the document is suitable for large contracts and tenders, including tier 1 contractual work.
  • Quick Delivery: To save you waiting time, the template is delivered quickly by email after purchase. Just download and get started to make your workplace safer!

This Safe Work Method Statement template is an essential tool designed to assist you in creating a safer and more compliant working environment for metal CNC waterjet cutting operations. Keep your peace of mind and let us help you tackle safety head-on.


The Metal Cnc Waterjet Cutting Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Machine malfunction
    • Improper use of personal protective equipment (PPE)
  • 2. Setup and Inspection
    • Wrong setup
    • Lack of inspection
  • 3. Feedstock Loading
    • Heavy lifting
    • Slips and Trips
  • 4. Machine Starting Process
    • Electric shock
    • Noise exposure
  • 5. CNC Programming
    • Incorrect data entry
    • Unknown machine operation
  • 6. Waterjet Cutting
    • High pressure injuries
    • Flying debris
  • 7. On-going Machine Operation
    • Exposure to heat
    • Repetitive motion injuries
  • 8. Material Unloading
    • Cuts and lacerations
    • Heavy lifting injuries
  • 9. Finishing Touches
    • Chemical exposure
    • Fire risk
  • 10. Quality Inspection
    • Poor lighting
    • Repetitive motion injuries
  • 11. Clean Up
    • Exposure to cleaning chemicals
    • Slips and falls
  • 12. Regular Maintenance
    • Exposure to biohazard materials
    • caught-in injuries
  • 13. Shutdown
    • Residual energy
    • Uncontrolled release of pressure
  • 14. Emergency Stop/Reset
    • Panic
    • lack of knowledge on procedures
  • 15. Documentation and Reporting
    • Incorrect report writing
    • non-compliance risk

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Cnc Waterjet Cutting Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart