Metal Cnc Turning Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Cnc Turning Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Cnc Turning Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Safe Work Method Statement Template for Metal CNC Turning Machine

This is a detailed and comprehensive Safe Work Method Statement Template specifically designed for a Metal CNC Turning Machine. It comes filled with general safety measures, tailored to fit your organisation’s needs.

  • Pre-filled and Comprehensive: No more guesswork as our template presents you with complete details filled in already, saving a chunk of your time without losing the value of safety your workplace demands.
  • Fully Editable and Customisable in Microsoft Word format: Each section of this template can be altered to suit your specific requirements. Because it is entirely editable, you can spin it anyway depending on what suits your needs best.
  • Includes project scope and project details: Get a vivid understanding of everything covered under the project. From the scope to minute project details, every iota of information is captured for perfect execution.
  • Includes checklist of any high-risk machinery on site: Stay ahead by identifying all high-risk machines on the job site. Our intuitive checklist style helps to single out dangerous equipment ensuring no risks go unnoticed.
  • Includes space for recording any staff training: Consistently track the progress of your crew with dedicated spaces for logging all staff training sessions and outcomes.
  • Includes before and after risk ratings: Observe the improvement in working situations with before and after risk ratings. This feature allows you to measure the effectiveness of implemented safety measures.
  • Includes resources for use of legislative references: Stay up-to-date with legal requirements. We’ve incorporated references to related legislations and regulations for easy reference so you’re always in the know.
  • Includes all PPE required: Clearly state all necessary Personal Protective Equipment (PPE) for tasks. This exhaustive list ensures workers are prepared and safe while operating dangerous equipment.
  • Includes risk assessment and risk assessment matrix: Identify, analyse, and treat all potential hazards with a straightforward risk assessment methodology and associated matrix. A systematic way to get ahead of issues before they escalate.
  • Includes a checklist to ensue all requirements have been covered when implementing the SWMS: Safeguard against missed steps and gaps in safety measures by running through this integral checklist that’s been baked into the template.
  • Includes sign off page for all workers and responsible persons: Encourage accountability with our dedicated sign-off sheet. It acts proof of each employee’s understanding and cooperation towards the established safety operations.
  • Easy to use, Easy to customise: Designed to be intuitive without feeling generic. The sections are logically ordered making navigation easy thus improving how you work with the template
  • Suitable for large contracts and Tenders, including tier 1 contractual work: This is your proficient aide whether you’re applying for sizable government contracts or private tenders, including tier 1 work.
  • Quick delivery by email: You’ll receive it fast via email; right after purchase. No unnecessary waiting period as we understand how crucial safety is to your business.

Please note that while the SWMS template can greatly assist your workplace in maintaining a safer and compliant environment, using it does not guarantee complete safety at work. Nevertheless, structured implementation and adherence can translate to improved work safety results.


The Metal Cnc Turning Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Miscommunication
    • Not adhering to safety protocols
  • 2. Job Planning
    • Incorrect measurement
    • Material choice error
  • 3. Machine Checks
    • Equipment malfunction
    • Unanticipated start-up
  • 4. Testing and Set-Up
    • Machine misuse
    • Accidental switch or control activation
  • 5. Operating Machine
    • Exposure to sharp edges
    • High noise levels
  • 6. Tool Changing
    • Caught-in or -between incidents
    • Sharp tool hazard
  • 7. Maintenance Tasks
    • Faulty equipment
    • Electrical shock
  • 8. Cleaning Activities
    • Slipping on fluids
    • Chemical exposure
  • 9. Shut Down Procedure
    • Improper shutdown
    • Incomplete process
  • 10. Emergency Procedures
    • Inadequate training
    • Panic during emergency
  • 11. Transporting Machine Parts
    • Heavy lifting injuries
    • Falling objects
  • 12. Dealing with Waste Materials
    • Improper disposal
    • Exposure to harmful substances
  • 13. Final Inspection
    • Incorrect product specifications
    • Missed defects
  • 14. Reporting and Documentation
    • Failure to report incident
    • Misreporting information
  • 15. Worker Training and Instruction
    • Inadequate training
    • Non-compliance with safety procedures

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Cnc Turning Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart