Metal Chamfering Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Chamfering Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Chamfering Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Pre-filled and Comprehensive: Our Safe Work Method Statement Template for Metal Chamfering Machine comes with all relevant fields meticulously filled in. This allows you to use a complete document that saves your time while ensuring you don’t miss out on any important aspect.

Fully Editable and Customisable in Microsoft Word Format: The template is in an easy-to-edit Word format, enabling you to customise and tailor it speedily according to your operational requirements and specific project details.

Includes the Scope of the Project and the Project Details: It offers detailed spaces for outlining the scope of your project and other specific details. This ensures comprehensive documentation and better understanding for all involved.

Incorporates Checklist of Any High-Risk Machinery on Site: Included in the document is an exhaustive checklist for high-risk machinery, providing a useful tool to assist in preventing workplace injuries and mishaps by identifying potential hazards.

Incorporates Space for Recording Any Staff Training: The template features dedicated areas for recording all staff training sessions, helping track employee competence levels and promoting a safer workplace through continuous education.

Includes Before and After Risk Ratings: The SWMS Template demonstrates risk ratings before and after the implementation of control measures. This supports better decision-making processes regarding safety precautions and strategies in your workplace.

Legislative References: Offering valuable resources relating to legislative references, you’ll always have at hand the most current safety standards and legal frameworks applicable to your industry.

Specifies All PPE Required: It also expounds on all personal protective equipment (PPE) required for operating the metal chamfering machine, thus averting health risks and enhancing overall safety in your work environment.

Risk Assessment and Risk Assessment Matrix: The template delivers a detailed risk assessment and an analytical risk assessment matrix, thereby providing transparent, informed insights on potential hazards and their severity.

Includes a Checklist: It comes with a useful checklist to ensure that all safety requirements associated with the SWMS have been met before commencing your project.

Incorporates Sign Off Page for All Workers and Responsible Persons: For increased accountability and documentation, our SWMS Template includes a sign-off page ensuring all workers and responsible persons acknowledge understanding and willingness to comply with safety measures.

Easy to Use, Easy to Customise: With intuitive design features, our Template is both easy to use and customise, thus aiding those even with minimal technical knowledge to swiftly tailor it according to their unique needs.

Suitable for Large Contracts and Tenders: Due to its comprehensive nature, the template is suitable for large contracts, tenders, and even Tier 1 contractual work, providing you with a convenient tool within budget while keeping high-quality standards.

Quick Delivery by Email: To cater to your time-sensitive requirements, we ensure quick delivery of our SWMS Template directly to your inbox immediately after purchase.


The Metal Chamfering Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • Incorrect use of equipment
  • 2. Machine set-up
    • Improper handling of machines
    • electric shock
  • 3. Performing chamfering
    • Exposure to noise
    • Inhalation of metal dust
  • 4. Measurement and inspection
    • Inadequate lighting
    • erroneous measurements
  • 5. Tool changeover
    • Incorrect tool fitting
    • severe cuts
  • 6. Routine maintenance
    • Electric shock
    • burns from hot surfaces
  • 7. Defective parts replacement
    • Cuts and lacerations
    • incorrect installation
  • 8. Material feeding
    • Hand injuries
    • lifting heavy objects
  • 9. Operation monitoring
    • Poor posture
    • prolonged standing
  • 10. Final checking and approval
    • Incorrect labelling
    • overlooking defects
  • 11. Machine shut down
    • Inadvertent machine start
    • electric shock
  • 12. Storage and transportation
    • Faulty storage causing damage
    • manual handling issues
  • 13. Emergency procedures
    • Panic during emergencies
    • lack of training
  • 14. Waste Management
    • Inappropriate disposal resulting in pollution
    • injuries from sharp objects
  • 15. Reporting and documentation
    • Data privacy breaches
    • inaccurate data logging
  • 16. Regular intrusive tests
    • Exposure to radiation
    • wrong interpretation of results
  • 17. Pre-start safety briefings
    • Insufficient knowledge about risks
    • non-adherence to safety rules
  • 18. Audits and Reviews
    • Overlooking of minor non-compliances
    • inadequate audit process
  • 19. Team meetings
    • Interpersonal conflicts
    • stress from work overload
  • 20. End-of-day clean up
    • Exposure to cleaning chemicals
    • slips and falls

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Chamfering Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart