Metal Chain Making Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Chain Making Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Metal Chain Making Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:
Safe Work Method Statement Template for Metal Chain Making Machine

This user-friendly, specialised Safe Work Method Statement (SWMS) template is designed with the specific needs of your metal chain making operations in mind. Here are some notable features:

  • Pre-filled and Comprehensive: The SWMS template includes detailed sections that have been thoughtfully prefilled to guide you in documenting your procedures accurately and effectively. Our goal is to help you save time while ensuring you don’t miss crucial details.
  • Fully editable and customisable in Microsoft Word format: We understand the need for unique adjustments based on your business requirements. Therefore, the SWMS template can be easily modified using Microsoft Word without any fancy software or technical expertise.
  • Includes the scope of the project and the project details: This feature aids in outlining the exact plan from inception till completion, including all specifics related to the project such as tasks, timelines, and involved parties.
  • Includes checklist of any high-risk machinery on site: Our central focus is safety, thus the presence of a checklist to account for any hazardous equipment, helping ensure safety measures are comprehensive and fool-proof.
  • Includes space for recording any staff training: Proper training documentation is vital for legal obligations and employee skill development. The convenient placeholders in our template lend a hand in tracking this data.
  • Includes before and after risk ratings: A risk rating system helps in quantifying the overall risks before and after applying safety measures, giving you a clear yardstick to measure your safety level progress.
  • Includes resources for use of legislative references: Referencing relevant legislation is imperative to maintain compliance, and we’ve got you covered by including an easy-to-access resource section.
  • Includes all PPE required: Detailing all necessary Personal Protective Equipment (PPE) is part and parcel of the SWMS template, to ensure staff are always properly equipped for tasks at hand.
  • Includes risk assessment and risk assessment matrix: Comprehensive risk assessments coupled with an easy-to-understand risk matrix ensures hazards are identified, evaluated and controlled effectively.
  • Includes a checklist to ensure all requirements have been covered: This handy feature facilitates ticking off all safety stronghold points as you go along to verify a watertight SWMS.
  • Includes sign off page for all workers and responsible persons: An absolute must for transparency and accountability, this allows everyone involved to acknowledge their understanding and commitment to the SWMS.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Developed with versatility in mind, this template satisfies the demands of larger contracts and tenders without missing a beat.
  • Easy to use, easy to customise: Designed to be uncomplicated regardless of tech-savviness, allowing you to alter it to perfectly match your needs with ease.
  • Quick delivery by email: As things can get urgent, trust us to deliver the SWMS template via email swiftly after purchase.

Remember folks, there’s no one-size-fits-all solution for workplace health and safety. However, this flexible, comprehensive SWMS template equips you with a strong basis for crafting a rock-solid health and safety strategy for your metal chain making operations.


The Metal Chain Making Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect machine set-up
    • Inadequate training
  • 2. Machine Setup
    • Entanglement in moving parts
    • Trapped between chains
  • 3. Raw Material Loading
    • Manual handling injuries
    • Slips and trips
  • 4. Operating Machine
    • High noise levels
    • Exposure to flying debris
  • 5. Unloading Processed Chains
    • Contact with hot surfaces
    • Manual lifting injuries
  • 6. Maintenance and Cleaning
    • Uncontrolled release of energy
    • Exposure to hazardous chemicals
  • 7. Clearing a Machine Jam
    • Unexpected start-up
    • Crush injuries
  • 8. Perform Inspection Tasks
    • Working at height risks
    • Eye strain due to inspection work
  • 9. Fault identification and Reporting
    • Electrical hazards
    • Repetitive manual tasks
  • 10. Material Transportation
    • Manual handling injuries
    • Collisions during transportation
  • 11. Quality Control Check
    • Exposure to hazardous substances
    • Constantly high noise levels
  • 12. Packaging
    • Sharp edges or points
    • Manual lifting injuries
  • 13. Waste Management
    • Handling sharp objects
    • Exposure to harmful dust and fumes
  • 14. Machine Shutdown
    • Unauthorized machine operation
    • Residual energies
  • 15. Documentation and Reporting
    • Sedentary work for long periods
    • Mental stress from reporting tasks
  • 16. Emergency Procedures
    • Fire risks and emergency evacuation obstacles
    • Lack of first aid training
  • 17. End of Shift
    • Fatigue from long working hours
    • Risks associated with insufficient lighting
  • 18. Machine Start-up
    • Entanglement in start-up procedure
    • Crush injuries

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Chain Making Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart