Maintenance On Mobile Plant Safe Work Method Statement (SWMS)

$96.80

The Maintenance On Mobile Plant Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Maintenance On Mobile Plant Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Maintenance On Mobile Plant Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Maintenance On Mobile Plant Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Maintenance On Mobile Plant Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Maintenance On Mobile Plant Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Maintenance On Mobile Plant Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Exposure to hazardous substances
  • 2. Inspection of Plant
    • Contact with moving parts
    • Electrocution
  • 3. Tools gathering
    • Injury from improper handling
    • Cuts from sharp tools
  • 4. Lockout/tagout
    • Accidental start-up
    • Electrical shock
  • 5. Dismantling Equipment
    • Falling objects
    • Caught-in/between hazards
  • 6. Component examination
    • Exposure to harmful dust or fumes
    • Eye injuries
  • 7. Replacing components
    • Strain and sprains
    • Crush injuries
  • 8. Assembly
    • Pinch points
    • Lacerations from sharp edges
  • 9. Functional testing
    • Projectiles
    • Unexpected startup
  • 10. Cleaning up
    • Musculoskeletal disorders from improper lifting
    • Puncture wounds from sharps
  • 11. Waste Disposal
    • Manual handling injuries
    • Exposure to toxins
  • 12. Return tools
    • Tripping over misplaced objects
    • Strain injury
  • 13. Documentation update
    • Ergonomic stressors
    • Dust inhalation
  • 14. Communication
    • Miscommunication resulting in accidents
    • Distractions leading to mishaps
  • 15. Final inspection
    • Missed defect causing unexpected malfunction
    • Physical harm from defective equipment
  • 16. Debriefing
    • Psychological stress
    • Fatigue leading to accidents
  • 17. Training next shift
    • Misunderstanding instructions leading to accidents
    • Strain from improper technique
  • 18. Maintenance systems update
    • Software faults causing miscommunication
    • Eye strain from prolonged screen time
  • 19. Feedback and Improvement
    • Overlooked safety measures
    • Inadequate hazard reporting
  • 20. Final Check
    • Non-observance of proper shutdown sequences
    • Incorrect usage of machinery

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Maintenance On Mobile Plant Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart