BlueSafe

Low Loader Trailer SWMS

This SWMS covers low-loader trailer transport tasks from planning and loading through travel, unloading and demobilisation.

Activities covered include

  • Plan the transport task and establish the work area
  • Position and isolate the load
  • Unload plant and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Low Loader Trailer SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers low-loader trailer transport tasks from planning and loading through travel, unloading and demobilisation. It supports planning and risk management for vehicle movement, ramps, trailer components, plant loading, load restraint and overhead hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the transport task and establish the work area
  • Complete pre-start inspections of the trailer and equipment
  • Position the prime mover and trailer
  • Detach the gooseneck and prepare ramps and deck
  • Load plant onto the trailer deck
  • Position and isolate the load
  • Restrain the load for transport
  • Reattach the gooseneck assembly
  • Complete departure checks and monitor the load during travel
  • Unload plant and demobilise

Who is this for?

For contractors, workers, supervisors and businesses carrying out low-loader trailer transport and plant-loading work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan transport task
  • Incorrect trailer selection
  • Overmass combination
  • Inadequate route clearance
  • Unplanned public interaction
  • Fatigue-related driving error
Establish work area
  • Pedestrian struck by plant
  • Vehicle collision
  • Uneven or soft ground
  • Overhead service contact
  • Unauthorised entry
Complete pre-start inspections
  • Brake failure
  • Tyre failure
  • Hydraulic hose rupture
  • Defective ramps
  • Load restraint failure
  • Unexpected plant movement
Position prime mover and trailer
  • Reversing collision
  • Crush at articulation point
  • Trailer roll-away
  • Plant instability
  • Overhead obstruction strike
Detach gooseneck low loader deck
  • Crush from gooseneck movement
  • Trailer roll-away
  • Hydraulic failure
  • Stored energy release
  • Falling deck
  • Slip from deck access
Prepare ramps and deck
  • Ramp collapse
  • Crush from ramp movement
  • Slip or fall from deck
  • Deck instability
  • Pinch-point injury
Load plant onto deck
  • Plant roll-over
  • Plant falling from ramps
  • Crush by moving plant
  • Deck overload
  • Overhead service contact
  • Collision with trailer
Position and isolate load
  • Load shift
  • Crush from plant movement
  • Unstable axle loading
  • Fall from trailer deck
  • Stored hydraulic energy
Restrain load for transport
  • Load displacement
  • Chain or binder recoil
  • Struck by loose restraint
  • Fall from trailer deck
  • Manual handling strain
Reattach gooseneck assembly
  • Crush between prime mover and deck
  • Gooseneck collapse
  • Coupling failure
  • Hydraulic hose failure
  • Trailer roll-away
  • Unexpected vehicle movement
Conduct departure checks
  • Load loss during travel
  • Brake or lighting failure
  • Oversize load strike
  • Tyre failure
  • Unsecured equipment
Travel and monitor load
  • Vehicle roll-over
  • Load shift
  • Collision with road users
  • Bridge or overhead strike
  • Driver fatigue
  • Tyre blowout
Unload plant and demobilise
  • Plant falling from ramps
  • Crush by mobile plant
  • Gooseneck movement
  • Load restraint recoil
  • Slip and trip hazards
  • Environmental spill

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to consult, manage risks, provide safe plant, maintain plant, provide information, training, instruction and supervision, and control powered mobile plant.
  • Applicable road transport, heavy vehicle, mass, dimension, fatigue-management and load-restraint requirements in the relevant jurisdiction.
  • Model Code of Practice: How to Manage Work Health and Safety Risks.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace.
  • Model Code of Practice: Construction Work, where the activity is construction work.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces, where workers may fall from the deck, load or access equipment.
  • Safe Work Australia workplace traffic-management guidance and site traffic-management requirements.
  • AS/NZS 4380:2001 Cargo restraint systems.
  • AS/NZS 4602.1 High visibility safety garments.
  • AS/NZS 2210.3 Personal protective equipment—Safety footwear.
  • AS/NZS 1801 Occupational protective helmets.
  • AS/NZS 1270 Acoustics—Hearing protectors.
  • AS 1742.3 Manual of uniform traffic control devices—Traffic control for works on roads.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Transport and LogisticsCivil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment