Loading and Unloading Plant on Prime Mover Risk Assessment

$79.50

The Loading and Unloading Plant on Prime Mover Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Loading and Unloading Plant on Prime Mover Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Loading and Unloading Plant on Prime Mover Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Lack of training
    • inadequate PPE
  • 2. Site Assessment
    • Uneven ground
    • proximity to traffic
  • 3. Equipment Check
    • Faulty brakes
    • hydraulic leaks
  • 4. Loading Area
    • Obstructions
    • insufficient lighting
  • 5. Position Prime Mover
    • Incorrect alignment
    • unstable surface
  • 6. Attach Trailer
    • Pinch points
    • incorrect hitching
  • 7. Load Inspection
    • Overloading
    • unsecured load
  • 8. Begin Loading
    • Falling objects
    • use of incorrect equipment
  • 9. Monitor Process
    • Distraction
    • communication failure
  • 10. Stabilise Load
    • Load shift
    • balance issues
  • 11. Secure Load
    • Inadequate strapping
    • loose items
  • 12. Inspect Load
    • Missed securing points
    • fatigue
  • 13. Unload Preparation
    • Blocking access
    • emergency plan absence
  • 14. Begin Unloading
    • Sudden load movement
    • unqualified personnel
  • 15. Final Checks
    • Equipment left on site
    • trailing hazards
  • 16. Departure
    • Visibility issues
    • travel route clearance
  • 17. Documentation
    • Incomplete records
    • misunderstanding procedures
  • 18. Debrief
    • Lessons not learned
    • omitted feedback
  • 19. Maintenance
    • Delayed check-ups
    • missed wear and tear signs
  • 20. Continuous Improvement
    • Failure to update SWMS
    • ignoring incident reports
Shopping Cart