Safe Work Method Statement Template for Loading and Unloading of Materials at Worksite
Pre-filled and Comprehensive: This isn’t just a basic framework; we’ve gone the extra mile to make sure this template includes all the essentials, providing you a comprehensive format that only requires minor alterations.
Fully editable and customisable in Microsoft Word format: Our SWMS Template comes in an easy-to-edit Microsoft Word format so you can customise it to your liking without any hassles.
Includes scope of the project and project details: This element will allow you to outline the specifics of what your project involves, enabling clear understanding and transparency between all parties involved.
Features checklist for high-risk machinery on site: The template already includes a checklist pointing out potential hazards associated with machinery used within the worksite, allowing easy risk identification.
Staff training record: We have also dedicated a section towards recording important staff training, maintaining an organised record of employee capabilities directly on the document.
Before and After Risk Ratings: This feature allows assessment of risks before the job starts and re-evaluation once measures are in place, providing accountability and tracking risk reduction efforts.
Resources for legislative references provided: References to necessary legislation resources available for you to remain compliant at all times.
Incorporates all required PPE: An inventory of Personal Protective Equipment (PPE) required for the job is included in the template, promoting adherence to safety regulations.
Risk Assessment Matrix and Checklist included: An intuitive risk assessment matrix and a thorough checklist ensure that no stone is left unturned when identifying potential hazards.
Sign-off page included: The template includes a sign-off section for all workers and supervisors, proving comprehension and agreement of the established safety procedures.
User-friendly design: The format is designed to be easily understood and filled out, making it hassle-free for everyone involved.
Suitable for large projects: This isn’t just for small projects; it’s perfect for large contracts and Tenders including tier 1 contractual work as well, demonstrating its versatility.
Quick Email Delivery: Upon purchase, your template will be delivered straight to your inbox. You don’t have to wait for days or even hours; It’s prompt, convenient, and time-saving.
The Loading and Unloading of Materials at Worksite Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Mishandling of materials
- Trip hazards from untidy work area
- Inadequate personal protective equipment (PPE)
- 2. Pre-Loading Inspection
- Miscalculation of weight loads
- Faulty loading equipment
- 3. Loading Materials
- Crushing injuries due to falling objects
- Strains from improper lifting methods
- 4. Securing Load
- Falling objects
- Insecurely fastened load risks
- 5. Transport
- Spills
- Vehicular accidents due to improperly secured materials
- 6. Unloading Site Inspection
- Failure to recognize unloading dangers
- Slippery or uneven surface
- 7. Unfastening Load
- Loose materials falling
- Pinching or crushing injuries while unfastening
- 8. Unloading Materials
- Falls during manual handling
- Collision with other workers or machinery
- 9. Post-Unloading Inspection
- Missed potential hazards due to haste or carelessness
- Failing to secure unused equipment
- 10. Machine Shutdown
- Burns from hot surfaces
- Electric shock
- 11. Waste Disposal
- Exposure to harmful substances
- Fires due to improper disposal
- 12. Clean-up
- Trip hazards from debris on floor
- Biological hazards (needles
- chemicals etc.)
- 13. Reporting
- Incomplete or incorrect reporting leading to potential future risks
- 14. Review Safety Measures
- Non-compliance with established safety procedures
- Inadequate PPE
- 15. Training Update
- Insufficient true-to-life training
- Poor communication of procedures and guidelines
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Loading and Unloading of Materials at Worksite Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


