Liquid Waste Handling Safe Work Method Statement (SWMS)

$96.80

The Liquid Waste Handling Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Liquid Waste Handling Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing our Safe Work Method Statement Template, specifically designed for liquid waste handling. It comes packed with a whole host of features that are both practical and essential in making sure your projects run smoothly and safely:

  • Pre-filled and Comprehensive: This template is detailed and thorough, outlining pertinent project information to keep everyone on the same page about tasks and risks.
  • Fully Editable: Amend it clearly in Microsoft Word to suit the distinctive needs of your company. Change, add or remove parts as required without any fuss.
  • Specific Project Details: Key project factors like the scope of the project are incorporated. This ensures all bases are covered before work commences.
  • Machinery Checklist: Identify any high-risk machines you’ll be working with on site. Stay ahead with crucial checks and balances.
  • Staff Training Record: Essential space allocated for documenting your team’s training – a valuable tool to verify expertise and encourage upskilling.
  • Risk Ratings: Evaluate risk levels both pre- and post-mitigation strategies. It’s about staying informed and prepared at every step.
  • Legislative Resources: Includes references to assist in aligning practices with legislative requirements. Understand what the law says about safety procedures in waste handling.
  • PPE List: Essential personal protective equipment (PPE) needed for the task is indicated clearly. Safety and protection are paramount in the course of duty.
  • Risk Assessment Matrix: An inbuilt mechanism to assist you in assessing the severity and likelihood of potential hazards.
  • Implementation Checklist: Ensuring you’ve crossed your T’s and dotted your I’s when implementing the SWMS. It leaves no stone unturned!
  • Sign-off Page: An essential part for keeping track of who has read, understood and accepted their responsibilities in following the SWMS.

Apart from these features, our template is also:

  • Accessible: Easy to use and straightforward to customise, this template aims to make safety both practicable and achievable for anyone.
  • Adaptable: A suitable pick regardless of your contract size, from tier 1 contractual work to smaller projects.
  • Fast Delivery: In order to ensure no time is wasted, we deliver swiftly via email once the purchase is confirmed.

We’ve walked your walk, known the pressures you face each single day in ensuring safety at the workplace. We are here to assist you every step of that way. Our Safe Work Method Statement Template is designed not as a magical solution, but as a helping tool towards fostering a safer and compliant workspace.


The Liquid Waste Handling Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • Trips and Falls
    • Chemical Burns
  • 2. Liquid Waste Collection
    • Incorrect Manual Handling
    • Exposure to Hazardous Substances
  • 3. Transporting Waste
    • Traffic Accidents
    • Spillages
  • 4. Unloading Waste
    • Leakage
    • Explosion
  • 5. Waste Treatment
    • Chemical Reaction Risks
    • Equipment Failure
  • 6. Disposal of Treated Waste
    • Environmental Contamination
    • Unsanitary Conditions
  • 7. Vehicle Maintenance
    • Injury from Tools
    • Exposure to Harmful Dusts
  • 8. Health Monitoring
    • Medical Records Issues
    • Non-compliance with Laws
  • 9. Training
    • Insufficient Competence
    • Language Barriers
  • 10. Emergency Responses
    • Unprepared for Emergencies
    • Inadequate Resources
  • 11. Record Keeping
    • Data Breach
    • Loss of Records
  • 12. Method Statement Reviews
    • Outdated Procedures
    • Neglect of New Risks
  • 13. Personal Protection Equipment Checks
    • Wear and Tear
    • Incorrect Usage
  • 14. Hazardous Materials Checks
    • Weak Containers
    • Insufficient Labelling
  • 15. Incident Reporting
    • Delay in Reporting
    • Incorrect Information

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Liquid Waste Handling Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart