Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Lighting-Check And Replace Bulbs Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Electric shock
- falling from height
- 2. Ladder set-up
- Falling objects
- slips and falls
- 3. Inspect illumination area
- Poor visibility
- environmental hazards
- 4. Select suitable bulb
- Broken glass injury
- incorrect handling
- 5. Removing Old Bulb
- Electric shock
- burns
- eye strain
- 6. Check fixture and wiring
- Electric shock
- trip hazards
- 7. Install new bulb
- Incorrect installation
- electric shock
- 8. Test new bulb
- Ineffective lighting
- electric shock
- 9. Dispose of old bulb
- Sharp objects
- Unsafe disposal
- 10. Clean Up
- Slips and trips
- unsafe waste disposal
- 11. Document process
- Unclear record-keeping
- miscommunication
- 12. Post replacement inspection
- Missed hazards
- ineffective lighting
- 13. Final clean of work area
- Slips and trips
- unsafe waste disposal
- 14. Report any issues
- Unclear reporting procedures
- lack of follow up
- 15. Return of equipment
- Manual handling
- wrongly stored equipment
- 16. Verification of task completion
- Incomplete work
- overlooked errors
- 17. Informing stakeholders
- Miscommunication
- overlooked errors
- 18. Follow up inspections
- Missed hazards
- ineffective lighting
- 19. Regular maintenance check
- Inconsistent maintenance
- overlooked hazards
- 20. Emergency procedures briefing
- Lack of knowledge
- confusion in emergencies