Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Lifting Large Precast Components Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Improper training
- Inadequate personal protective equipment (PPE)
- 2. Equipment Inspection
- Damaged equipment
- Faulty safety devices
- 3. Position Crane
- Overhead power lines
- Slipping and falling
- 4. Rigging of Load
- Incorrect sling angles
- Exceeding weight limit
- 5. Lifting Pre-Cast Component
- Collision with other objects
- Falling objects
- 6. Transport Pre-Cast Component
- Toppling over
- Unexpected movements
- 7. Installation of Pre-Cast Component
- Crush injuries
- Structural collapse
- 8. Dismantling and De-rigging
- Uncontrolled release of load
- Equipment failure
- 9. Post-Operation Checks
- Inadequate maintenance checks
- Ignoring minor faults
- 10. Cleanup
- Slips
- trips and falls
- Sharp objects
- 11. Documenting & Reporting
- Loss of documents
- Inaccurate data inputs
- 12. Emergency Management
- Lack of proper emergency training
- Inadequate emergency resources
- 13. Post-Lift Analysis
- Missed Hazardous conditions
- lack of risk assessment accuracy
- 14. Equipment Storage
- Unauthorized access
- Equipment damage due to improper storage
- 15. Review and Evaluation
- Incomplete hazard identification
- Failure to identify change in operations