Laying New Flooring Safe Work Method Statement (SWMS)

$96.80

The Laying New Flooring Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Laying New Flooring Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Laying New Flooring Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Laying New Flooring Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Laying New Flooring Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Laying New Flooring Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Laying New Flooring Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to dust
    • trip hazards
  • 2. Removal of existing flooring
    • Risk of injury from tools
    • dust inhalation
    • strain injury from heavy lifting
  • 3. Surface Cleaning
    • Slippery surface
    • hazardous cleaning solution
  • 4. Laying underlay
    • Manual handling injuries
    • kneeling for long periods
  • 5. Threading cables
    • Electrocution
    • trip hazards
  • 6. Laying new floor panels
    • Choking hazard from small pieces
    • sharp edges
  • 7. Trimming and adjusting panels
    • Injury from sharp tools
    • splinters or sharp edges of material
  • 8. Gluing / nailing panels
    • Chemical exposure
    • fire hazard from flammable materials
  • 9. Buffing and smoothening
    • Noise hazards
    • vibration hazard from machinery
  • 10. Sealing floor
    • Chemical fume inhalation
    • flammability
  • 11. Cleaning up site
    • Slip and fall
    • lifting heavy objects
    • exposure to dust and debris
  • 12. Disposal of waste materials
    • Injury from sharp items
    • biological and chemical hazards
  • 13. Inspecting finished work
    • Trip hazards
    • slips
    • and falls
  • 14. Completion Record Keeping/Documents
    • Strain from repetitive movements
    • eye strain from digital screens
  • 15. Review and monitor task performance
    • Stress
    • trip hazards
    • slips
    • and falls

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Laying New Flooring Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart