
Lathe Metal Spinning SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers lathe metal spinning from job review and equipment inspection through forming, component removal, cleaning and handover. It supports planning by addressing risks associated with rotating parts, ejected materials, sharp edges, noise, vibration and plant adjustments.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the job, work area and emergency arrangements
- Inspect the lathe, guards and safety systems
- Select materials, mandrels and forming tools
- Mount and secure blanks and workholding
- Set speeds and conduct a low-speed proving run
- Carry out metal spinning while monitoring vibration and defects
- Stop the lathe and remove finished components
- Change tooling or mandrels safely
- Clean swarf, spills and the work area
- Complete shutdown, records and handover
Who is this for?
For contractors, workers, supervisors and businesses carrying out lathe metal spinning activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review job and work area |
|
| Inspect lathe and safety systems |
|
| Select material and mandrel |
|
| Mount blank and workholding |
|
| Set speed and forming tools |
|
| Conduct low-speed proving run |
|
| Perform metal spinning |
|
| Monitor process and defects |
|
| Stop and remove component |
|
| Clean swarf and spills |
|
| Change tooling or mandrels |
|
| Complete shutdown and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, information, training, supervision, consultation, hazardous chemicals, noise and PPE.
- Model Code of Practice: Managing Risks of Plant in the Workplace — guidance on guarding, ejected workpieces, loose tools, entanglement and isolation.
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work (November 2024) — guidance on reducing plant noise at the source and maintaining noise controls.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace — guidance on SDS, chemical control measures, ventilation, inspection and maintenance.
- Model Code of Practice: How to Manage Work Health and Safety Risks.
- Model Code of Practice: Hazardous Manual Tasks.
- AS 4024.1 series Safety of machinery; AS/NZS 1337.1 Personal eye-protection; AS/NZS 1270 Hearing protectors; AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 2210.3 Safety footwear; AS 2550 series Cranes, hoists and winches—Safe use, where applicable.
- Manufacturer’s operating manual, tooling instructions, workholding limits and maintenance requirements for the specific lathe.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80