Landscaping Activities SWMS

This SWMS covers landscaping activities from pre-start planning and site access through ground preparation, installation, planting and clean-up.
Activities covered include
- Plan the work sequence and pre-start arrangements
- Install drainage and irrigation components
- Operate cutting equipment and complete site clean-up
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers landscaping activities from pre-start planning and site access through ground preparation, installation, planting and clean-up. It supports work planning and risk management for vehicles, plant, services, materials, tools, dust, chemicals and weather exposure.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work sequence and pre-start arrangements
- Establish site access and manage public exposure
- Receive, unload and store materials and plant
- Inspect plant, tools and equipment before use
- Locate underground services before ground work
- Excavate, grade and prepare ground
- Install drainage and irrigation components
- Construct landscape features using supplied materials
- Cut paving and masonry materials
- Plant and place softscape materials
- Apply chemicals and fertiliser
- Operate cutting equipment and complete site clean-up
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out landscaping activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Establish site access |
|
| Receive materials and plant |
|
| Inspect plant and tools |
|
| Locate underground services |
|
| Excavate and grade ground |
|
| Install drainage and irrigation |
|
| Construct landscape features |
|
| Cut paving and masonry |
|
| Plant and place softscape |
|
| Apply chemicals and fertiliser |
|
| Operate cutting equipment |
|
| Manage weather exposure |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: How to manage work health and safety risks (Safe Work Australia, November 2024) — guidance for identifying hazards, consulting workers and applying the hierarchy of controls.
- Model Code of Practice: Construction work (Safe Work Australia, November 2024) — guidance for construction work, essential services, outdoor heat/UV exposure, work surfaces and access.
- Model Code of Practice: Managing the risks of plant in the workplace — guidance for inspection, safe operation, separation of people and powered mobile plant, and maintenance.
- Model Code of Practice: Hazardous manual tasks — guidance for eliminating or minimising musculoskeletal risks.
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace — guidance for SDS, registers, labelling, storage and exposure controls.
- Model Code of Practice: Managing the risk of falls at workplaces — guidance where workers may fall from one level to another.
- Model Codes of Practice are guidance material and should be checked against the legislation, regulations and approved codes in force in the jurisdiction where the work is undertaken.
- Relevant technical guidance: AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS 1319 Safety signs for the occupational environment; AS 1742.3 Traffic control devices for works on roads; AS/NZS 1337.1 Eye and face protection; AS/NZS 1270 Hearing protectors; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 2210.3 Safety footwear; AS 1801 Occupational protective helmets; AS/NZS 4602.1 High-visibility safety garments; AS 4454 Composts, soil conditioners and mulches.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates