Landscaping Activities Safe Work Method Statement (SWMS)

$96.80

The Landscaping Activities Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Landscaping Activities Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Landscaping Activities Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Landscaping Activities Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Landscaping Activities Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Landscaping Activities Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Landscaping Activities Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Unstable ground
    • Manual handling injuries
  • 2. Site Assessment
    • Falling objects
    • Trip hazards
  • 3. Tree Removal
    • Falling branches
    • Noise hazards
  • 4. Excavation
    • Collapse of excavation
    • Contact with services
  • 5. Soil Compaction
    • Use of heavy equipment
    • Repeated actions causing strain
  • 6. Installing Drainage System
    • Exposure to hazardous substances
    • Manual handling injuries
  • 7. Structural Building
    • Risk of falling from height
    • Tool related injuries
  • 8. Soft Scaping
    • Allergic reactions
    • Bites and stings
  • 9. Hard Scaping
    • Manual handling injuries
    • Use of power tools
  • 10. Installing Irrigation System
    • Exposure to electrical components
    • Trench collapses
  • 11. Planting
    • Back strains
    • Cuts from sharp objects
  • 12. Mulching and Fertilising
    • Exposure to dust
    • Reaction to chemicals
  • 13. Mowing or Trimming
    • Flying Objects
    • Hearing damage
  • 14. Site Clean Up
    • Tripping over debris
    • Exposure to dust and allergens
  • 15. Review and Evaluation
    • Exposure to sun
    • Allergic reactions
  • 16. Maintenance Activities
    • Falling objects
    • Equipment malfunction

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Landscaping Activities Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart