BlueSafe

Landscape Construction and Hardscaping SWMS

This SWMS covers site setup, material delivery, construction, installation, cleaning and handover for landscape construction and hardscaping.

Activities covered include

  • Set up the site and complete induction
  • Lay paving and hardscape
  • Clean up and hand over the site

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Landscape Construction and Hardscaping SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers site setup, material delivery, construction, installation, cleaning and handover for landscape construction and hardscaping. It supports work planning and risk management by addressing plant, excavation, materials, dust, access, outdoor features and site clean-up.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Set up the site and complete induction
  • Deliver materials and plant
  • Carry out demolition and garden renovation
  • Set out and excavate
  • Install drainage and geofabric
  • Build retaining walls
  • Lay paving and hardscape
  • Install steps and fencing
  • Construct ponds and water features
  • Prepare soil, install synthetic turf, shades and sports fixtures
  • Install outdoor kitchens and maintain patios or fountains
  • Clean up and hand over the site

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out landscape construction and hardscaping activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Site setup and induction
  • Unauthorised site entry
  • Public interaction
  • Uneven ground
  • Overhead electrical lines
  • Heat stress
  • Poor access
Deliver materials and plant
  • Vehicle collision
  • Plant strike
  • Crush from unloaded materials
  • Falling pallet
  • Manual handling injury
  • Public exposure
Demolition and garden renovation
  • Hidden asbestos materials
  • Flying debris
  • Silica dust
  • Sharp waste
  • Unstable fence or structure
  • Hand-arm vibration
Set out and excavate
  • Underground services strike
  • Trench collapse
  • Plant roll-over
  • Worker struck by plant
  • Fall into excavation
  • Water ingress
  • Contaminated ground
Drainage and geofabric installation
  • Manual handling strain
  • Trips on fabric
  • Cut from utility knife
  • Drainage trench collapse
  • Dust exposure
  • Tree-root damage
Build retaining walls
  • Wall collapse
  • Crush from stone blocks
  • Suspended load
  • Silica dust
  • Manual handling strain
  • Fall from work platform
Lay paving and hardscape
  • Respirable silica dust
  • Concrete burns
  • Cuts from pavers
  • Manual handling strain
  • Noise exposure
  • Flying fragments
Install steps and fencing
  • Fall from steps
  • Post-hole collapse
  • Pinch points
  • Concrete exposure
  • Fence panel instability
  • Power-tool injury
Construct ponds and water features
  • Drowning
  • Excavation collapse
  • Electrical shock
  • Chemical exposure
  • Manual handling injury
  • Water contamination
Prepare soil and features
  • Plant strike
  • Rock ejection
  • Dust exposure
  • Manual handling strain
  • Biological exposure
  • Uneven ground
Install synthetic turf
  • Manual handling strain
  • Cuts from knives
  • Adhesive vapours
  • Trips on seams
  • Infill dust
  • Plant interaction
Install shades and sports fixtures
  • Fall from height
  • Suspended load
  • Anchor failure
  • Overhead electrical contact
  • Goalpost overturn
  • Stored tension release
Install outdoor kitchens
  • Electrical shock
  • Gas leak
  • Crush from cabinetry
  • Silica dust
  • Fire
  • Sharp edges
Clean patios and maintain fountains
  • Electrical shock
  • Chemical splash
  • Pressure injection
  • Slip hazard
  • Noise exposure
  • Biological exposure
Clean up and hand over
  • Plant strike
  • Trips and slips
  • Sharp waste
  • Residual excavation
  • Unauthorised access
  • Environmental contamination

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to identify hazards, apply the hierarchy of controls, maintain and review controls, consult workers, and prepare a SWMS for applicable high risk construction work.
  • Model Code of Practice: Construction work (November 2024) — guidance for construction planning, heat exposure, essential services and SWMS requirements; model Codes are guidance unless adopted in the relevant jurisdiction.
  • Model Code of Practice: Excavation work — guidance for excavation planning, ground stability, service identification, battering, benching and shoring.
  • Model Code of Practice: Managing the risks of plant in the workplace — guidance for plant selection, maintenance, traffic separation, lifting and electrical-line risks.
  • Moving plant on construction sites Code of Practice — guidance for mobile-plant traffic management, service locating, SDS access and airborne-contaminant controls.
  • Model Code of Practice: Managing respirable crystalline silica in the workplace — guidance for identifying silica-containing materials, controlling processing and prohibiting uncontrolled dry processing.
  • Model Codes of Practice: Managing risks of falls at workplaces; Managing electrical risks in the workplace; Managing hazardous manual tasks; Managing noise and preventing hearing loss at work; Managing risks of hazardous chemicals in the workplace; Confined spaces; and First aid in the workplace, as adopted or applied in the relevant jurisdiction.
  • Guidance standards: AS/NZS 2210.3 safety footwear; AS/NZS 1270 hearing protectors; AS/NZS 1337.1 eye and face protection; AS/NZS 1715 and AS/NZS 1716 respiratory protection; AS/NZS 1801 industrial safety helmets; AS/NZS 3012 electrical installations—construction and demolition sites; AS/NZS 1576 scaffolding; AS 1891 industrial fall-arrest systems; AS/NZS 5532 anchor devices; AS 1418 series cranes, hoists and winches; AS 2550 series safe use of cranes; AS 4685 playground equipment where relevant; and AS 4422 playground surfacing where relevant.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionLandscaping ContractorsFencing ContractorsGardening and Lawn Care

Related templates

$79.50

$96.80

Save $17.30

One-time payment