Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Jib Crane Operation Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Accidental falls
- Inappropriate positioning of the crane
- 2. Inspection of Crane
- Rusting and wear
- Electrical issues
- 3. Operation Training
- Inadequate training
- Miscommunication
- 4. Loading
- Overloading
- Incorrect loading methods
- 5. Lifting
- Dropping loads
- Swinging loads
- 6. Moving Loads
- Collision with workers or structures
- Uncontrolled movements
- 7. Positioning
- Inaccurate positioning
- Unsafe ground conditions
- 8. Unloading
- Falling objects
- Incorrect unloading methods
- 9. Maintenance
- Machinery failure
- Electric shock
- 10. Emergency Procedures
- Inadequate knowledge of procedures
- Panic
- 11. Shutdown
- Incorrect sequences
- Incomplete shutdown process
- 12. Examination of Crane After Use
- Missing examination
- Inadequate inspection
- 13. Storage
- Improper storage
- Equipment damage from weather
- 14. Review of Procedure
- Non compliance
- outdated procedures
- 15. Crane Disassembly
- Dismantling accidents
- Lack of competent personnel
- 16. Site Clean Up
- Incorrect disposal
- Leftover debris endangering personnel
- 17. Health Monitoring
- Exposure to noise and vibration
- Long-term musculoskeletal disorders
- 18. Review and Reporting of Incidents
- Non-reporting of incidents
- Incomplete incident reports
- 19. Communication about Risks
- Poor communication leading to risks
- Lack of participation in discussions
- 20. Remediation and Risk Management Strategies
- Inadequate strategies
- Non-implementation of remedial actions