Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Isolate Gas Supply Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Improper tools
- Unauthorised access
- 2. Shut off gas supply
- Gas leakage
- Inadequate safety measures
- 3. Check valve operation
- Valve failure
- Mechanical injury
- 4. Test for presence of gas
- Gas explosion potential
- Human error
- 5. Purge gas lines
- Risk of combustion
- Incorrect purging procedures
- 6. Disconnect gas supply
- Physical injury
- Equipment damage
- 7. Separate components
- Fatal gas exposure
- Equipment malfunctioning
- 8. Lock out/tag out
- Accidental reconnection
- Missing lock out/tag out procedures
- 9. Remove old parts
- Asbestos exposure
- Sharp edges
- 10. Clean work area
- Trip hazards
- Chemical spill
- 11. Install new system
- Inadequate training
- Faulty equipment
- 12. Test new system
- Uncontrolled release of gas
- Inadequate testing parameters
- 13. Sign-off and Document
- Inaccurate documentation
- Noncompliance to safety regulations
- 14. Resume gas supply
- Gas leakage
- Incomplete work
- 15. Post-Operation Inspection
- Missed hazard
- Damage to new system