Internal Strip-Out Soft Demolition and Refurbishment Risk Assessment

This risk assessment covers internal strip-out, soft demolition and refurbishment activities, including planning, service isolation, removal work and waste handling.
Activities covered include
- Review the site and plan strip-out work
- Carry out overhead strip-out and work at height
- Prepare for emergencies and secure the site at the end of shift
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This risk assessment covers internal strip-out, soft demolition and refurbishment activities, including planning, service isolation, removal work and waste handling. It supports planning and risk management by addressing hazardous materials, structural conditions, access, tools, dust and emergency arrangements.
Activities & Risks Covered
This assessment addresses activities and risks including:
- Review the site and plan strip-out work
- Isolate and verify existing services
- Establish work areas and control access
- Remove non-structural fixtures and finishes
- Manage dust, airborne contaminants and hazardous materials
- Carry out overhead strip-out and work at height
- Use portable tools, small plant and temporary power
- Handle waste, load-out activities and housekeeping
- Monitor structural stability, hidden conditions and changes
- Prepare for emergencies and secure the site at the end of shift
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out internal strip-out, soft demolition and refurbishment work.
Activities & Hazards Covered
| Activity | Potential Hazards |
|---|---|
| Pre-start planning and site review |
|
| Service isolation and verification |
|
| Establishment of work area, access control and occupied area separation |
|
| Internal strip-out of non-structural fixtures and finishes |
|
| Dust, airborne contaminants and hazardous materials |
|
| Work at height and overhead strip-out |
|
| Portable tools, small plant and temporary power |
|
| Waste handling, load-out and housekeeping |
|
| Structural stability, hidden conditions and change management |
|
| Emergency response, incident management and end-of-shift safety |
|
Need to tailor this risk assessment?
Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:
- Model guidance: Model Code of Practice: Managing the work environment and facilities — 1.2 Managing risks associated with the work environment and facilities; p. 12.
- Model guidance: Model Code of Practice: Demolition work — 3. Planning the demolition work; p. 18.
- Model guidance: Model Code of Practice: How to manage and control asbestos in the workplace — 2.1. What is involved in managing risks?; p. 12.
- Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
- Model guidance: Model Code of Practice: How to manage work health and safety risks — 2. Step 1 — How to identify hazards; p. 12.
- Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
- Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
- Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
Standard Risk Assessment Features (Click to Expand)
- Activity-specific hazard identification and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each activity
- Risk matrix and assessment classification
- Review, monitoring and sign-off fields
- Site-specific customisation before use
Suitable for Industries
Related templates
$79.50
Includes free branding + 2 years of free updates
$79.50
Free branding + 2 years of updates