Internal External Lock-Up Fix Stage Carpentry Safe Work Method Statement (SWMS)

$96.80

The Internal External Lock-Up Fix Stage Carpentry Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Internal External Lock-Up Fix Stage Carpentry Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

If you’re gearing up for an internal or external lock-up and fix stage carpentry project, a solid plan is essential to ensure not just compliance with workplace health and safety regulations, but also the smooth running of your operations. Our Safe Work Method Statement (SWMS) Template is crafted precisely for these needs, providing an extensive yet straightforward path to keeping your site safe. Here’s what makes our SWMS Template a valuable tool in your project management arsenal:

Pre-filled and Comprehensive

  • This template isn’t just a blank slate; it comes pre-filled with generic tasks and risks associated with carpentry work, saving you time and hassle.

Fully Editable and Customisable in Microsoft Word Format for Easy Editing

  • Tailor everything to your specific project needs. Whether it’s adding new tasks, adjusting the risks, or fine-tuning the procedures, our editable MS Word format makes modifications a breeze.

Includes the Scope of the Project and the Project Details

  • Outline the full scope of your carpentry project along with detailed project information to keep everyone informed and aligned from start to finish.

Includes Checklist of Any High Risk Machinery on Site

  • Identify and document high-risk machinery utilised in the carpentry tasks, enhancing focus on critical safety checks and measures.

Includes Space for Recording Any Staff Training

  • Keep track of training completed by your team, ensuring that all personnel are up to speed on the latest safety protocols and operational techniques.

Before and After Risk Ratings

  • Assess the risk levels before implementing safety controls and review them post-implementation to gauge effectiveness and improve future SWMS iterations.

Includes Resources for Use of Legislative References

  • Stay compliant with the laws through handy references, making sure every element of your carpentry work meets legal standards.

Includes All PPE Required

  • Detailed list of Personal Protective Equipment necessary for each task within your carpentry project, ensuring worker safety at all phases.

Includes Risk Assessment and Risk Assessment Matrix

  • A thorough framework to identify, evaluate, and manage the risks associated with your carpentry activities effectively.

Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS

  • A step-by-step rundown to verify every aspect of the SWMS is addressed before work commences, supporting thorough prep work.

Includes Sign off Page for All Workers and Responsible Persons

  • An essential feature where workers and supervisors confirm their understanding and adherence to the laid-out SWMS, promoting accountability.

Easy to Use, Easy to Customise

  • Designed with simplicity and adaptability in mind, suitable even for those less versed in formal documentation protocols. This means focusing more on your craftsmanship and less on paperwork!

Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work

  • The professional setup of our template ensures it meets the rigorous requirements often demanded in big projects and tender submissions.

Quick Delivery by Email

  • No waiting around! Get your SWMS Template swiftly via email so you can get started straight away.

Prepare your carpentry projects with confidence using our reliable Safe Work Method Statement Template, designed to make safety a priority without compromising the efficiency of your workflow.


The Internal External Lock-Up Fix Stage Carpentry Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Site Preparation
    • Tripping
    • Exposure to chemicals
  • 2. Material Handling
    • Back injury
    • Dropping materials
  • 3. Setting Out
    • Incorrect measurements
    • Equipment failure
  • 4. Framing Installation
    • Falls from height
    • Tool misuse
  • 5. Weatherproofing
    • Slips
    • Exposure to harsh weather
  • 6. Roof Trusses
    • Falling objects
    • Working at heights
  • 7. Window Installation
    • Glass breakage
    • Manual handling injuries
  • 8. Wall Sheathing
    • Cuts from sharp edges
    • Heavy lifting
  • 9. Electrical Wiring
    • Electrocution
    • Fire hazard
  • 10. Insulation
    • Skin irritation
    • Inhalation of fibres
  • 11. Plasterboarding
    • Dust inhalation
    • Overexertion
  • 12. Ceiling Fixtures
    • Falling objects
    • Ladder stability issues
  • 13. Door Installation
    • Pinching fingers
    • Tool accidents
  • 14. Floor Finishing
    • Chemical exposure
    • Slippery surfaces
  • 15. Painting and Decorating
    • Fumes
    • Working on scaffolding
  • 16. Clean-up Operations
    • Sharp objects
    • Waste disposal incidents
  • 17. Equipment Dismantling
    • Collapsing structures
    • Incorrect dismantling
  • 18. Final Inspection
    • Miscommunication
    • Overlooking details
  • 19. Sign-off and Handover
    • Documentation errors
    • Client dissatisfaction
  • 20. Safety Debrief
    • Non-compliance to safety procedures
    • Inadequate feedback process

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Internal External Lock-Up Fix Stage Carpentry Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart