Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Installing New Transformers Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Manual Handling
- Slips/trips/falls
- 2. Site Assessment
- Electric shock
- Working in Public areas
- 3. Transport Transformers
- Traffic interaction
- Manual handling
- 4. Unloading Transformer
- Falling objects
- Manual Handling
- 5. Installation Preparation
- Energy sources
- Chemical exposure
- 6. Lifting Transformer Into Position
- Crushing
- Falling equipment
- 7. Secure Transformer
- Incorrect installation
- Faulty equipment
- 8. Install Cabling
- Electric shock
- Cutting/abrasive hazards
- 9. Connect Cabling
- Faulty Equipment
- Electrical energy
- 10. Insulation Installment
- Chemical burns
- Inhalation of particles
- 11. Initial Testing
- Electric shock
- System failure
- 12. System Integration
- System malfunction
- Cybersecurity threat
- 13. Transformer Energisation
- Electric Shock
- Component failure
- 14. Final Inspection and Testing
- Electric Shock
- Non-conformity with standards
- 15. Clean Up and Disposal
- Manual Handling
- Chemical Exposure
- 16. Documentation
- Data error
- Omission of relevant information
- 17. Review and Maintenance Planning
- Faulty equipment
- Lapses in maintenance
- 18. Conduct Training
- Inadequate training
- Misunderstanding instruction
- 19. Monitor and Review
- Inadequate monitoring
- Insufficient feedback
- 20. Emergency Procedures Briefing
- Incorrect procedures
- Lack of first aid training