Installing in Ground Fire Main SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers installing an in-ground fire main from planning, service location and trench excavation through pipe installation, testing, backfilling and close-out. It supports work planning and risk management by addressing traffic, plant, excavation, lifting, pressurised water and reinstatement hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work sequence, isolate the area and prepare for site conditions
- Set traffic, plant and public-access controls
- Locate and expose underground services
- Excavate the trench and support trench walls
- Prepare bedding and the trench base
- Unload and stage pipe
- Lower, align and stabilise pipe in the trench
- Joint pipe and fittings
- Install valves and thrust blocks
- Hydrostatically test the fire main
- Backfill and compact the trench
- Reinstate the area and complete close-out activities
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out in-ground fire main installation.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and isolate area |
|
| Set traffic and plant controls |
|
| Locate and expose services |
|
| Excavate trench and support walls |
|
| Prepare bedding and trench base |
|
| Unload and stage pipe |
|
| Lower and align pipe |
|
| Joint pipe and fittings |
|
| Install valves and thrust blocks |
|
| Hydrostatic test fire main |
|
| Backfill and compact trench |
|
| Reinstate and close out |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction Work — guidance for SWMS, construction-work planning, essential services and excavation controls.
- Model Code of Practice: Excavation Work — guidance for excavation planning, trench collapse prevention, service information, access, support and inspections.
- Model Code of Practice: Managing Risks of Plant in the Workplace.
- Model Code of Practice: Managing the Risks of Falls at Workplaces.
- Model Code of Practice: Confined Spaces — apply where a pit, chamber or excavation meets the confined-space definition.
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work.
- AS 2419.1 Fire hydrant installations — system design, installation, commissioning and maintenance guidance.
- AS/NZS 2566 Buried flexible pipelines — installation guidance where applicable to the specified pipework.
- AS 1742.3 Manual of uniform traffic control devices — traffic control for works on roads.
- AS/NZS 3012 Electrical installations — construction and demolition sites.
- AS 2550 series Cranes, hoists and winches — safe use guidance.
- AS 4991 Lifting devices — safe use guidance.
- AS/NZS 1891 series Industrial fall-arrest systems and devices.
- AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.
- AS/NZS 2210.3 Safety footwear, AS/NZS 1801 Industrial safety helmets, AS/NZS 1337.1 Eye and face protection, AS/NZS 1270 Hearing protectors and AS/NZS 4602.1 High-visibility safety garments.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80