BlueSafe

Plumbing Trenching and Drainage SWMS

This SWMS covers plumbing trenching and drainage work, including site planning, service location, excavation, installation, testing and reinstatement.

Activities covered include

  • Plan drainage work and assess site conditions
  • Install drainage components, fixtures, pits and backflow devices
  • Backfill, reinstate surfaces and complete site handover

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Plumbing Trenching and Drainage SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers plumbing trenching and drainage work, including site planning, service location, excavation, installation, testing and reinstatement. It supports planning for excavation, plant, water, sewage, pipework and site-access hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan drainage work and assess site conditions
  • Establish access, exclusion areas and plant positioning
  • Locate and expose underground services
  • Excavate trenches and pits and control water ingress
  • Prepare bedding and lay drainage pipes
  • Install drainage components, fixtures, pits and backflow devices
  • Service septic and sewage systems
  • Inspect drains and clear blockages
  • Test drainage and commission the system
  • Backfill, reinstate surfaces and complete site handover

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out plumbing trenching and drainage activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and assess site
  • Incorrect drainage route
  • Underground services strike
  • Basement flooding
  • Contaminated soil
  • Unplanned high-risk work
Establish site access and exclusion
  • Unauthorised entry
  • Vehicle collision
  • Pedestrian strike
  • Fall into excavation
  • Public exposure to sewage
Position plant and complete pre-starts
  • Plant roll-over
  • Crush from slewing plant
  • Reversing collision
  • Hydraulic failure
  • Overhead powerline contact
Locate and expose services
  • Electric shock
  • Gas release
  • Water main rupture
  • Telecommunications damage
  • Service explosion
Excavate trench and pits
  • Trench collapse
  • Worker engulfment
  • Fall into trench
  • Falling spoil
  • Plant strike
  • Groundwater ingress
Control water and dewater excavation
  • Basement flooding
  • Water inundation
  • Electrical shock
  • Pump hose failure
  • Contaminated-water exposure
  • Erosion of trench walls
Prepare bedding and lay pipes
  • Manual handling strain
  • Crush from pipe movement
  • Silica dust
  • Poor pipe alignment
  • Trench entry hazards
Install drainage and fixtures
  • Solvent vapours
  • Chemical splash
  • Incorrect drainage connection
  • Manual handling strain
  • Sharp pipe edges
Install pits and backflow devices
  • Crush from pit components
  • Fall into deep pit
  • Confined atmosphere
  • Backflow contamination
  • Manual handling strain
Service septic and sewage systems
  • Hydrogen sulphide exposure
  • Biological contamination
  • Sewage splash
  • Confined space entry
  • Pump entanglement
  • Unexpected sewage release
Inspect drains and clear blockages
  • Sewage splash
  • High-pressure hose injury
  • Tree-root tools
  • Camera cable entanglement
  • Confined atmosphere
  • Manual handling strain
Test drainage and commission system
  • Drain plug ejection
  • Water release
  • Backflow contamination
  • Slip hazards
  • Incorrect system performance
Backfill and reinstate surface
  • Plant strike
  • Pipe damage
  • Compactor vibration
  • Dust exposure
  • Ground settlement
  • Manual handling strain
Clean up and hand over
  • Contaminated waste
  • Trips and slips
  • Residual open excavation
  • Unsecured tools
  • Environmental pollution

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Safe Work Australia Model Code of Practice: Excavation Work, used as guidance only and subject to adoption in the relevant jurisdiction. It identifies collapse, falls, falling objects and airborne contaminants as excavation risks, and requires trench support controls for trenches 1.5 m or deeper unless supported by geotechnical advice.
  • Safe Work Australia Model Code of Practice: Construction Work, used as guidance only and subject to adoption in the relevant jurisdiction. It covers high risk construction work, SWMS preparation, implementation and review.
  • Safe Work Australia Model Code of Practice: Managing the Risks of Plant in the Workplace.
  • Safe Work Australia Model Code of Practice: Confined Spaces.
  • Safe Work Australia Model Code of Practice: How to Manage Work Health and Safety Risks.
  • Safe Work Australia Model Code of Practice: Managing the Risk of Falls at Workplaces.
  • Safe Work Australia Model Code of Practice: Hazardous Manual Tasks.
  • Safe Work Australia Code of Practice: How to Safely Remove Asbestos, where suspected or confirmed asbestos-contaminated soil is encountered.
  • AS/NZS 3500 Plumbing and drainage series; AS/NZS 2566 Buried flexible pipelines; AS 2865 Confined spaces; AS 4744 Trench shields; AS 1742.3 Traffic control devices for works on roads; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksPlumbing and Gasfitting

Related templates

$79.50

$96.80

Save $17.30

One-time payment