Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Installation Of Trench Mesh In Footings Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Unstable ground
- Inadequate protective equipment
- 2. Site Assessment
- Unsuitable weather conditions
- Excavation collapse
- 3. Equipment Inspection
- Faulty equipment
- Lack of training
- 4. Trench Marking
- Incorrect measurements
- Striking underground services
- 5. Excavation of Trench
- Ground instability
- Contact with buried utilities
- 6. Soil Classification
- Incorrect classification
- Unfavourable soil conditions
- 7. Setting Out
- Inaccurate setting out
- Tripping hazards from tools and equipment
- 8. Trench Mesh Handling
- Manual handling injuries
- Mesh entanglement
- 9. Installation of Trench Mesh
- Falling into the trench
- Incorrect installation causing structural issues
- 10. Post-Installation Inspection
- Injury from remaining in the trench
- Faulty structures left undetected
- 11. Backfilling
- Backfill material spills
- Working near machinery
- 12. Leveling and Compacting
- Incorrect leveling
- Tripping hazards
- 13. Clean Up
- Trips and falls over debris
- Inadequate waste disposal
- 14. Final Site Review
- Missed steps in the process
- Undetected risks or hazards
- 15. Record Keeping
- Loss of documents
- Miscommunication due to insufficient or inaccurate records
- 16. Post-Activity Evaluation
- Insufficient feedback leading to unimproved procedures
- Ignored occupational diseases symptoms
- 17. Equipment Maintenance
- Untreated or unnoticed wear and tear,Inadequate equipment checks
- 18. Training for Future Activities
- Insufficient or inadequate training
- Misunderstanding of procedures due to lack of clarity
- 19. Routine Site Assessments
- Misjudged conditions or risks
- Failure to detect changes in the site environment
- 20. Ongoing Review of Procedures
- Outdated procedures
- Missed opportunities for improvement