Installation of Refrigeration Plant Risk Assessment

$79.50

The Installation of Refrigeration Plant Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Installation of Refrigeration Plant Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Installation of Refrigeration Plant Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • safety documentation not complete
    • site induction ignored
  • 2. Arrive at Site
    • traffic hazards
    • slips/trips/falls
  • 3. Unload Equipment
    • manual handling injuries
    • equipment fall
  • 4. Site Inspection
    • unidentified hazards
    • unsafe structures
  • 5. Set Up Work Area
    • poor ergonomics
    • electrical hazards
  • 6. Electrical Isolation
    • electric shock
    • arc flash
  • 7. Position Plant Components
    • crushing injuries
    • lifting strain
  • 8. Connect Refrigeration Piping
    • chemical exposure
    • burns
  • 9. Connect Electrical Wiring
    • electrocution
    • fire
  • 10. Install Control Systems
    • equipment malfunction
    • poor wiring
  • 11. Test Electrical Systems
    • electrical faults
    • equipment failure
  • 12. Charge Refrigeration System
    • refrigerant leak
    • pressure hazards
  • 13. Test Refrigeration Plant
    • system failure
    • refrigeration burns
  • 14. Commission System
    • unexpected auto-start
    • noise
  • 15. Final Inspection
    • missing checks
    • incomplete documentation
  • 16. Clean Work Area
    • sharp objects
    • waste management
  • 17. Handover to Client
    • miscommunication
    • operation misunderstanding
Shopping Cart