
Installation of PVC Pipe in Trench Less 1.5 Metres SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers installing PVC pipe in a trench less than 1.5 metres deep, from planning and service location through trench work, pipe installation, testing and backfilling. It supports work planning and risk management by addressing plant, excavation, manual handling, jointing, pressure testing and site access.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the scope, pipe requirements and site hazards
- Set up the work area and control trench access, vehicles and pedestrians
- Locate and protect underground services
- Inspect trench conditions, ground stability and water ingress
- Position plant and delivery vehicles near the trench
- Unload and stage PVC pipe
- Prepare bedding and the trench base
- Lower PVC pipe into the trench
- Align and joint PVC pipe
- Install fittings and appurtenances
- Inspect the line and test the installation
- Place embedment and marker tape, then backfill and compact the trench
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out PVC pipe installation in trenches less than 1.5 metres deep.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and plan work |
|
| Set up work area |
|
| Locate and protect services |
|
| Inspect trench and ground |
|
| Position plant and delivery vehicle |
|
| Unload and stage PVC pipe |
|
| Prepare bedding and trench base |
|
| Lower pipe into trench |
|
| Align and joint PVC pipe |
|
| Install fittings and appurtenances |
|
| Inspect line and test |
|
| Place embedment and marker tape |
|
| Backfill and compact trench |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide information, training, instruction and supervision, consult workers, manage construction work, control plant risks and obtain underground essential-services information before excavation.
- Model Code of Practice: Excavation Work — guidance for ground stability, trench collapse prevention, inspection, access, barriers and services protection. The Code notes that previously excavated, made-up or waterlogged ground requires particular attention because collapse risk can increase.
- Model Code of Practice: Construction Work — guidance for planning, consultation, coordination and SWMS for applicable high-risk construction work.
- Model Code of Practice: Managing the Risks of Plant in the Workplace — guidance for plant risk assessment, authorised operation, traffic rules, exclusion zones, maintenance and emergency procedures.
- Model Code of Practice: Managing the Risk of Falls at Workplaces — guidance for barricading or guarding excavation edges; a barrier approximately 1.5 m from the excavation edge is identified as a control option.
- Model Code of Practice: Work Health and Safety Consultation, Cooperation and Coordination.
- AS/NZS 1260 PVC-U pipes and fittings for drain, waste and vent applications.
- AS/NZS 2032 Installation of PVC pipe systems.
- AS/NZS 2566 Buried flexible pipelines.
- AS 3798 Guidelines on earthworks for commercial and residential developments.
- AS 1742.3 Manual of uniform traffic control devices — traffic control for works on roads.
- AS/NZS 3000 Wiring Rules and relevant electricity-network operator requirements where electrical services may be affected.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80