Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Installation and Pressure Testing of Chilled Water Pipes Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Trip hazards
- Incorrect Manual Handling
- 2. Transport of Pipes
- Traffic Accidents
- Overexertion
- 3. Installation-Trenching
- Cave-ins (Collapses)
- Falling Objects
- 4. Installation-Placing Pipes
- Struck by Object
- Equipment Failure
- 5. Backfilling Trench
- Falls
- Soil Instability
- Entanglement
- 6. Connection to the System
- Electric Shock
- Leakage
- 7. Initial System Check
- System Failure
- Electric Shock
- 8. Pressure Testing Setup
- Explosion
- Fire Hazard
- 9. During Pressure Testing
- Pipe Burst
- Leakage
- Exceeding Test Pressure
- 10. Post-Test Evaluation
- Faulty Assessment
- Ignoring safety measures
- 12. Evaluate Leakage Repair
- Improper evaluation
- Missed additional leaks
- 13. Final Inspection &Clear Down
- Missing Safety Measures
- Improper Evaluation
- 14. Report Documentation
- Incorrect Information
- Missed data
- 15. Waste Disposal
- Hazards Material
- Incorrect Disposal Method