Install Power Take-Offs Safe Work Method Statement (SWMS)

$96.80

The Install Power Take-Offs Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Install Power Take-Offs Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Install Power Take-Offs Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Install Power Take-Offs Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Install Power Take-Offs Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Install Power Take-Offs Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Install Power Take-Offs Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate safety knowledge
    • Trip & fall hazards
  • 2. Site Inspection
    • Unexpected traffic movement
    • Inadequate lighting
  • 3. Unloading Equipment
    • Manual lifting
    • Contact with sharp objects
  • 4. Assembling PTOs
    • Pinching/crushing injury
    • Electrical Shock
  • 5. Installation of PTOs
    • Struck by moving equipment
    • Working at heights
  • 6. Dismantle and Reassemble
    • Manual handling injuries
    • Loose parts falling
  • 7. Testing Power Take-Off
    • Caught-in/between
    • Noise exposure
  • 8. Commissioning
    • Wrong operating procedures
    • Equipment failure
  • 9. Cleanup
    • Slips
    • trips
    • and falls
    • Incorrect manual handling
  • 10. Maintenance
    • Exposure to harmful substances
    • Risk of fire
  • 11. Troubleshooting
    • Electrical shock
    • Burns from hot surfaces
  • 12. Setup Operation
    • Inappropriate Personal Protective Equipment (PPE)
    • Drop object hazards
  • 13. Vehicle Movement
    • Collision with pedestrians or objects
    • Falls from height
  • 14. Using Lifting Equipment
    • Force exertion resulting in sprains
    • Working under suspended loads
  • 15. Standby/Wait Time
    • Heat stress
    • Acute muscular strain
  • 16. Stowage and Secure Load
    • Inadequate securing of load
    • Ineffective communication
  • 17. Travel to Disposal Site
    • Traffic hazards
    • Incorrect manual handling
  • 18. Packing Up/Leaving Site
    • Trip & fall hazard
    • Lack of hazard identification

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Install Power Take-Offs Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart