Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Install Mast And Rigging Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Exposure to weather elements
- Manual handling of heavy materials.
- 2. Risk Assessment
- Incomplete hazard identification
- Lack of communication.
- 3. Equipment Inspection
- Faulty equipment
- Inadequate personal protective equipment (PPE)
- 4. Site Set-up
- Slips
- trips and falls
- Falling objects.
- 5. Work Area Isolation
- Unauthorised access to work area
- Interference from other trades.
- 6. Rigging Assembly
- Entanglement with ropes
- Working at height hazards.
- 7. Lifting Mast
- Crushing or pinch points
- Ineffective communication among the team.
- 8. Securing Mast
- Rig instability
- Failure of attachments.
- 9. Rope Attachments
- Incorrect knots causing failure
- Excessive rope tension.
- 10. Mast Erection
- Falling from height
- Overexertion.
- 11. Stabilising Mast
- Inadequate securing
- Unexpected weather conditions.
- 12. Initial Testing
- Mast instability
- Incomplete installation.
- 13. Clean Up
- Manual handling injuries
- Slips
- trips and falls.
- 14. Equipment Pack Up
- Manual handling injuries
- Mishandling of equipment.
- 15. Reviewing Process
- Gaps in skills and knowledge
- Insufficient feedback process.
- 16. Documentation
- Loss of important documents
- Incomplete records.
- 17. Post-Installation Inspection
- Unchecked hazards
- Missed defects.
- 18. Debriefing Session
- Miscommunication
- Lack of participation.
- 19. Training Session
- Insufficient training
- Misunderstanding of instructions.
- 20. System Dis-establishment
- Manual handling injuries
- Slips
- trips and falls.