Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Implementing Energy Isolations. Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Lack of training
- improper usage of tools
- 2. Site Inspection
- Inadequate lighting
- falling objects
- 3. Tool Selection
- Using damaged tools
- inappropriate tools
- 4. Energy Isolation Identification
- Incorrect isolation
- equipment failure
- 5. Document Reviewal
- Outdated documents
- inaccurate information
- 6. Isolation Procedure Planning
- Incomplete plan
- overlooked isolation points
- 7. Equipment Check
- Faulty equipment
- uncalibrated instruments
- 8. Actual Isolation
- Improper isolation
- unexpected energy release
- 9. Verification of Isolation
- Insufficient verification
- ineffectual isolation
- 10. Work on Isolated Systems
- Residual energy
- system component failure
- 11. System Restoration
- Incomplete system restoration
- premature re-energisation
- 12. Clearance to Normal Operation
- Unverified system stability
- residual hazards
- 13. Post-Operation Monitoring
- Unnoticed operation anomalies
- insufficient data recording
- 14. Equipment Maintenance
- Poorly maintained tools
- defective safety devices
- 15. Reporting and Follow-up
- Absence of follow-ups
- inconsistent reporting