Hyperbaric Treatment Safe Work Method Statement (SWMS)

$96.80

The Hyperbaric Treatment Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Hyperbaric Treatment Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Hyperbaric Treatment Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Hyperbaric Treatment Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Hyperbaric Treatment Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Hyperbaric Treatment Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Hyperbaric Treatment Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Material mishandling
    • Insufficient training
  • 2. Pre-inspection of chamber
    • Defective equipment
    • Inappropriate maintenance
  • 3. Cleaning hydrobaric chamber
    • Chemical exposure
    • Slippery surfaces
  • 4. Equipment setup
    • Electrocution
    • Incorrect setup
    • Tripping over wires
  • 5. Checking life support system
    • Oxygen toxicity
    • Corrosion injury
  • 6. Patient introduction to chamber
    • Patient discomfort/panic
    • Unattended patient
  • 7. Chamber operation
    • Explosion risk
    • Decompression sickness
  • 8. In-chamber care
    • Barotrauma
    • Dehydration
    • Gas embolism
  • 9. Communicate with patient
    • Miscommunication
    • Increased anxiety levels
  • 10. Monitor patient’s vitals
    • Medical equipment failure
    • Misjudged patient response
  • 11. Decompress the chamber
    • Fast decompression
    • Barotraumas
  • 12. Post-treatment care
    • Inadequate monitoring
    • Improper care instructions
  • 13. Report writing
    • Poor documentation
    • Loss of critical information
  • 14. Chamber cleaning and maintenance
    • Exposure to biohazard
    • Chemical contact
  • 15. Quality Assurance checks
    • Incorrect report filing
    • Not following checklists
    • Lack of updates on changes in SOPs
  • 16. Emergency handling
    • Inadequate training
    • Panic under pressure
  • 17. Equipment storing
    • Physical injury due to improper handling
    • Damage or loss of equipment
  • 18. Final debriefing
    • Incomplete communication leading to misunderstandings
  • 19. Waste disposal
    • Exposure to biohazard
    • Improper waste disposal leading to environmental concerns
  • 20. Chamber shutdown for the day
    • Improper shutdown procedures
    • leaving critical systems on risking the integrity of the chamber

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Hyperbaric Treatment Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart