High-Voltage Switch Yard Entry Risk Assessment

$79.50

The High-Voltage Switch Yard Entry Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the High-Voltage Switch Yard Entry Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The High-Voltage Switch Yard Entry Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Electric shock
    • Falls
  • 2. Site Check
    • Uncontrolled energy source
    • Trip hazards
  • 3. Isolation
    • Incorrect isolation
    • Relying on others for isolations
  • 4. Safety Tools Setup
    • Incorrect use of safety tools
    • Lack of proper tools
  • 5. Control Measures Implementation
    • Incomplete measures
    • Incorrect procedures
  • 6. Lockout/Tag out procedure
    • Failure to lockout/tagout equipment properly
    • Bypassing lockout/tagout
  • 7. HV Equipment Check
    • Failure to identify all hazardous power sources
    • High voltage shock potential
  • 8. PPE Inspection
    • Wrong selection of PPE
    • Damaged PPE
  • 9. Switch Yard Entry
    • Electric flash
    • Unexpected energisation
  • 10. Maintenance tasks
    • Unplanned release of energy
    • Exposure to live elements
  • 11. Operate Control Devices
    • Malfunction of control devices
    • Miscommunication
  • 12. Complete Work Tasks
    • Working near hazards
    • Unsafe working procedures
  • 13. Lock Removal
    • Unlock without validating completion
    • Failure to verify energy restoration
  • 14. Post Work Check
    • Machinery faults overlooked
    • Residual hazards resulting from the maintenance work
  • 15. Task Debriefing
    • Poor communication
    • Unclear instruction during debriefing
  • 16. Review and Update SWMS
    • Omitted hazards
    • Inaccurate risk assessment
  • 17. Clear Work Area
    • Unused materials or tools left in workspace
    • Ignoring tidiness & cleanliness
  • 18. Document Completion
    • Incorrect documentation
    • Lack of detail in procedure recording
  • 19. Equipment Storage
    • Improper storage procedures
    • Tools left on-site
  • 20. Post Job Meeting
    • Missing critical discussion points
    • Incorrect documentation of session outcomes
Shopping Cart