Handle Abrasive Grinders Safe Work Method Statement (SWMS)

$96.80

The Handle Abrasive Grinders Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Handle Abrasive Grinders Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Handle Abrasive Grinders Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Handle Abrasive Grinders Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Handle Abrasive Grinders Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Handle Abrasive Grinders Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Handle Abrasive Grinders Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to noise
    • Handling heavy equipment
  • 2. Checking Equipment
    • Electric shock
    • Equipment malfunction
  • 3. Placing the Grinder
    • Falling objects
    • Slipping/Tripping
  • 4. Operating Grinder
    • Flying particles
    • Physical contact with moving parts
  • 5. Replacing Abrasive Disc
    • Sharp edges
    • Burr on disc
  • 6. Cleaning up Work Area
    • Risk of cuts from debris
    • Slips
    • trips and falls
  • 7. Storing Equipment
    • Manual handling injury
    • Stored energy mishaps
  • 8. Performing Regular Maintenance
    • Uncontrolled release of high-pressure fluids
    • Electrical Shock
  • 9. Disposing of Used Discs
    • Sharp Edges
    • Hazardous waste
  • 10. Site Clean Up
    • Trips/Slip/Fall
    • Exposure to dust and particles
  • 11. Decommissioning Grinder
    • Mechanical failure
    • Electrical hazards
  • 12. Emergency Procedure Familiarity
    • Miscommunication during emergencies
    • Lack of knowledge about procedures
  • 13. Reporting Any Defects
    • Incorrect report
    • Delay in reporting
  • 14. Rest Breaks
    • Fatigue
    • Inattention due to prolonged work
  • 15.Reviewing Safe Work Procedures
    • Non adherence to safe practices
    • Inefficiency in implementing SOPs
  • 16. Continuous Training
    • Inadequate training
    • Lack of refresher courses
  • 17. Communication among team
    • Misinterpretation of signals
    • Miscommunication accidents
  • 18. Personal Protective Equipment (PPE)
    • Incorrect usage of PPE
    • Lack of PPE
  • 19. Hygiene Practices
    • Spread of disease
    • Poor sanitation
  • 20. Dealing with Electrical Failures
    • Electrocution
    • Fire hazard

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Handle Abrasive Grinders Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart