Grout Pumping Safe Work Method Statement (SWMS)

$96.80

The Grout Pumping Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Grout Pumping Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Grout Pumping Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Grout Pumping Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Grout Pumping Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Grout Pumping Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Grout Pumping Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • Manual handling injuries
  • 2. Pump Set Up
    • High pressure system failure
    • Lifting heavy equipment
  • 3. Hose Set Up
    • Exposure to grout
    • Tripping over hoses
  • 4. Grout Preparation
    • Exposure to dust and chemicals
    • Slips on wet surfaces
  • 5. Filling the Mixer
    • Overexertion injuries
    • Exposure to moving parts
  • 6. Operation of Pump
    • Unexpected equipment start
    • Projectiles from burst pipes
  • 7. Moving Hoses Around
    • Manual handling injuries
    • Falling object injuries
  • 8. Cleaning Out
    • Exposure to hazardous substances
    • Manual handling injuries
  • 9. Transporting Equipment
    • Vehicle accidents
    • Strikes against objects
  • 10. End of Day Clean Up
    • Exposure to hazardous substances
    • Manual handling injuries
  • 11. Maintenance Works
    • Contact with live electrical parts
    • Falls from height
  • 12. Handling Emergencies
    • Inadequate first aid response
    • Panic response to emergencies
  • 13. Testing and Commissioning
    • Electric shock from faulty equipment
    • Unexpected equipment start
  • 14. Dealing With Incidents
    • Incorrect incident reporting
    • Inadequate medical attention
  • 15. Shut Down and Dismantling
    • Struck by moving parts
    • Flammable residue ignition
  • 16. Waste Material Disposal
    • Exposure to hazardous substances
    • Incorrect disposal procedures
  • 17. Storage of Equipment
    • Manual handling injuries
    • Slips
    • trips and falls
  • 18. Housekeeping
    • Poor hygiene practices
    • Exposure to pests or vermin
  • 19. Reviewing Work Operations
    • Inadequate review processes
    • Complacency towards reviewing operations
  • 20. Environmental Management
    • Spillage into environment
    • Release of pollutants

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Grout Pumping Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart