Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Groundwater Control Methods Risk Assessment includes the following job steps and related potential hazards:
- 1. Site Preparation
- Unstable ground
- Traffic management
- 2. Equipment mobilisation
- Equipment failure
- Untrained personnel
- 3. General site inspection
- Tripping hazards
- Lack of protective equipment
- 4. Administration controls setup
- Data mismanagement
- Inadequate documentation
- 5. Extraction well drilling
- Equipment malfunction
- Noise pollution
- 6. Positioning of pumps and pipework
- Improper installation
- Leakage
- 7. Connection to surface water system
- Water contamination
- Pump failure
- 8. Groundwater testing
- Biological hazards
- Chemical hazards
- 9. Monitoring groundwater levels
- Slips and falls
- Improper reading
- 10. System maintenance checks
- System failure
- Electrical faults
- 11. Waste management
- Improper disposal
- Leakage
- 12. Recordkeeping
- Data loss
- Miscommunication
- 13. Decontamination of equipment
- Exposure to hazardous substances
- Slippery surfaces
- 14. System deactivation
- Unexpected shutdown
- Electrical faults
- 15. Site clean-up & demobilisation
- Forgotten tools/equipment
- Waste disposal
- 16. Post-project review and reporting
- Inadequate feedback
- Missed information
- 17. Staff debriefing
- Missed information
- Ineffective communication
- 18. Routine checks post-project
- Site erosion
- Contamination resurgence
- 19. Quality assurance check
- Documentation error
- Non-compliance with standards
- 20. Continuous monitoring plan setup
- Data mismanagement
- Lack of process follow-up