
Glass Installation and On-Site Glazing SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers glass installation and on-site glazing, including planning, unloading, handling, positioning, securing and finishing glass. It supports planning access and lifting activities while managing glass breakage, cuts, falls, moving loads and work-area hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the work scope and plan the installation
- Set up and control the work area
- Unload, store and inspect glass panels
- Prepare access arrangements for elevated work
- Inspect the opening and supporting surface
- Set up lifting equipment for glass handling
- Manually handle glass panels
- Install frames and packers
- Place, secure and finish the glazing
- Inspect the work, clean up and demobilise
Who is this for?
For contractors, workers, supervisors and businesses carrying out glass installation and on-site glazing work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and plan work |
|
| Set up work area |
|
| Unload and store glass |
|
| Prepare access and heights |
|
| Inspect opening and substrate |
|
| Set lifting equipment |
|
| Manually handle glass panels |
|
| Install frames and packers |
|
| Place and secure glass |
|
| Seal and finish glazing |
|
| Drill or modify materials |
|
| Inspect and quality check |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to provide and maintain safe systems of work, consult workers, manage plant, hazardous manual tasks, falls, hazardous chemicals and construction work.
- Model Code of Practice: Construction Work (November 2024) — guidance for planning construction work, SWMS and managing high-risk construction activities.
- Model Code of Practice: Managing the Risk of Falls at Workplaces — guidance on safe access, edge protection and fall-prevention systems; refer to AS/NZS 4994 temporary edge protection where used.
- Model Code of Practice: Hazardous Manual Tasks — guidance for assessing and controlling lifting, carrying, pushing, pulling and repetitive handling risks.
- Model Code of Practice: Managing Risks of Plant in the Workplace — guidance for plant selection, inspection, guarding, isolation and mobile-plant interaction controls.
- Model Code of Practice: Managing Risks of Respirable Crystalline Silica in the Workplace — where drilling, cutting or grinding concrete, masonry, tiles or other silica-containing material is required; uncontrolled dry processing must not be used.
- AS 1288 Glass in buildings — Selection and installation; AS/NZS 2208 Safety glazing materials in buildings; AS 2047 Windows and external glazed doors in buildings.
- AS/NZS 1576 Scaffolding series and AS 4576 Guidelines for scaffolding; scaffolds over 4 m require applicable licensed scaffolding work and handover arrangements.
- AS/NZS 1891 Industrial fall-arrest systems and devices; AS/NZS 5532 Manufacturing requirements for single-point anchor device used for harness-based work at heights.
- AS 2550 Cranes, hoists and winches—Safe use series; AS 1418 Cranes, hoists and winches series; AS 4991 Lifting devices.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices; AS 2985 Workplace atmospheres—Respirable dust sampling.
- Model laws and model Codes of Practice are guidance only and do not automatically have legal effect in every jurisdiction; verify the requirements adopted in the jurisdiction where the work is undertaken.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80