BlueSafe

Fixed Scaffolding Erection and Dismantling SWMS

This SWMS covers fixed scaffolding erection, use, repair and dismantling, including planning, component handling, inspections and handover.

Activities covered include

  • Plan scaffold work and identify design, height, competency, loading and fall hazards.
  • Install ties, bracing, platforms and stairways.
  • Clean up components and demobilise the work area.

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Fixed Scaffolding Erection and Dismantling SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers fixed scaffolding erection, use, repair and dismantling, including planning, component handling, inspections and handover. It supports planning for falls, falling objects, scaffold stability, access, manual handling and site interaction hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan scaffold work and identify design, height, competency, loading and fall hazards.
  • Establish an exclusion zone and manage access, falling components, vehicles and overhead powerlines.
  • Unload, stack and inspect scaffold components and foundations.
  • Erect the base, first lift and successive lifts while managing falls, collapse and dropped objects.
  • Install ties, bracing, platforms and stairways.
  • Inspect and hand over the scaffold, then monitor its use and condition.
  • Repair damaged scaffold while controlling access, falls, components and falling-material hazards.
  • Dismantle scaffold progressively and manage fall, collapse and manual-handling hazards.
  • Clean up components and demobilise the work area.

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out fixed scaffolding activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan scaffold work
  • Incorrect scaffold design
  • Unplanned height changes
  • Inadequate worker competency
  • Overloading of platforms
  • Falls during erection
  • Conflicting site activities
Establish work exclusion zone
  • Unauthorised access
  • Falling scaffold components
  • Pedestrian strike
  • Vehicle interaction
  • Overhead powerline contact
  • Poor visibility
Unload and stack components
  • Crush from suspended load
  • Plant collision
  • Manual handling strain
  • Falling bundles
  • Unstable component stacks
  • Scaffold component damage
Inspect components and foundations
  • Scaffold collapse
  • Defective components
  • Ground subsidence
  • Base jack failure
  • Trip hazards
  • Hidden underground services
Erect base and first lift
  • Fall from incomplete scaffold
  • Scaffold overturn
  • Collapse from missing bracing
  • Crush between components
  • Dropped hand tools
  • Trips on base members
Erect successive scaffold lifts
  • Fall from height
  • Falling objects
  • Incomplete edge protection
  • Overreaching
  • Unsecured planks
  • Wind loading
  • Scaffold instability
Install ties and bracing
  • Scaffold tilting
  • Scaffold collapse
  • Anchor pull-out
  • Fall while tying
  • Structural damage
  • Wind-induced movement
Install platforms and stairways
  • Fall through platform gaps
  • Falls from stairways
  • Plank displacement
  • Trip hazards
  • Falling materials
  • Platform overload
Inspect and hand over scaffold
  • Use of incomplete scaffold
  • Unauthorised alteration
  • Falls from defective platform
  • Overloading
  • Electrical energisation
  • Poor emergency response
Use and monitor scaffold
  • Falls from platform
  • Overloading
  • Falling objects
  • Damaged scaffold
  • Unauthorised modifications
  • Lifeline anchor failure
Repair damaged scaffold
  • Collapse during repair
  • Fall from altered scaffold
  • Exposure to damaged components
  • Falling materials
  • Unauthorised access
  • Incorrect replacement parts
Dismantle scaffold progressively
  • Fall from height
  • Falling components
  • Scaffold collapse
  • Premature tie removal
  • Manual handling strain
  • Unauthorised access
  • Overhead electrical contact
Clean up and demobilise
  • Vehicle interaction
  • Manual handling strain
  • Trip hazards
  • Leftover scaffold components
  • Unauthorised access
  • Environmental contamination

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Managing the risk of falls at workplaces — use as guidance only and confirm the adopted or approved code applying in the relevant jurisdiction. It supports competent erection, alteration and dismantling; scaffold licensing where a person or object could fall more than 4 m; safe access; duty-rating controls; and prevention of unauthorised scaffold alterations.
  • Model Code of Practice: Construction work — use as guidance only and confirm the adopted or approved code applying in the relevant jurisdiction, including requirements for SWMS for applicable high risk construction work and powerline exclusion-zone controls.
  • AS/NZS 1576 Scaffolding series, including general requirements, couplers and accessories, and prefabricated or tube-and-coupler scaffolding.
  • AS 4576:2020 Guidelines for scaffolding.
  • AS/NZS 1891 Industrial fall-arrest systems and devices series.
  • AS/NZS 3012 Electrical installations — construction and demolition sites.
  • AS/NZS 1418 and AS 2550 series where cranes or other lifting plant are used to handle scaffold materials.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksDemolitionRoofing ContractorsMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment