Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Fix Broken Intercom System Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Unsafe location
- improper utilities
- 2. Equipment setup
- Incorrect tool use
- tripping hazards
- 3. Safety Check
- Inadequate protective wear
- non-compliance with safety procedures
- 4. Component Inspection
- Electrical shocks
- falling debris from intercom system
- 5. Isolate the System
- Receiving an electric shock
- incomplete isolation risk
- 6. Remove Damaged Part
- Sharp edges causing cuts
- dropping parts and injury
- 7. Install New Part
- Improper installation gear
- installing wrong part
- 8. Testing the system
- System failure
- electrical shocks
- 9. Secure Intercom System
- Loose fittings
- injury during securing process
- 10. Clean up workplace
- Non-removal of waste materials
- mishandling sharp objects
- 11. Re-test System After Installation
- System failure
- electrical shocks
- 12. Final paperwork & sign off
- Incorrect reporting
- missing hazard reports
- 13. Equipment pack down
- Incorrect handling of tools
- tripping hazards
- 14. Post maintenance safety check
- Non-compliance with safety procedures
- overlooked damage
- 15. Debrief & review
- Miscommunication
- overlooked safety violations