Fitting Portable Davit Arms Safe Work Method Statement (SWMS)

$96.80

The Fitting Portable Davit Arms Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Fitting Portable Davit Arms Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Fitting Portable Davit Arms Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Fitting Portable Davit Arms Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Fitting Portable Davit Arms Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Fitting Portable Davit Arms Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Fitting Portable Davit Arms Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect lifting technique
    • Ignorance of safety procedures
  • 2. Inspection of equipment
    • Faulty equipment
    • Failure to conduct regular checks
  • 3. Positioning of davit
    • Falling objects
    • Slips and falls on wet surface
  • 4. Lifting loads
    • Overloading
    • Incorrect lifting techniques
    • Equipment failure
  • 5. Securing load in new location
    • Collision with other workers or objects
    • Unstable loads slipping
  • 6. Dismantling Davits
    • Improper method for lowering the davit arm
    • Falling objects while dismantling
  • 7. Removal of material from site
    • Risks associated with manual handling and transport
  • 8. Cleaning up
    • Potential slips
    • trips
    • and falls; Faulty cleaning equipment
  • 9. Maintenance
    • Faulty equipment causing accidents
    • Electrical hazards
  • 10. Transporting Davit Arms
    • Unsecured loads during transportation
    • Risk of collision
  • 11. Storage
    • Improper storage resulting in damage or injury
  • 12. Emergency Procedures
    • Inadequate training leading to panic or further harm in an emergency situation
  • 13. Review and update SWMS
    • Failure to keep documents updated leading to outdated processes or overlooked risks
  • 14. Training of staff
    • Untrained personnel leading to increased risk
  • 15. Monitoring and surveillance
    • Insufficient monitoring leading to unnoticed risks
    • Employee fatigue
  • 16. Disposal
    • Risks associated with manual handling and improper disposal of materials
  • 17. Assessment and Review
    • Risks overlooked due to insufficient review processes
  • 18. Incident Management
    • Ineffective management resulting in greater harm or damage

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Fitting Portable Davit Arms Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart