
External Plumbing Water, Sewer & Gas SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers external water, sewer and gas work, from planning and service location through excavation, pipe installation, testing, backfilling and emergency response. It supports work planning and risk management by addressing service strikes, excavation, plant, pipe, gas, water, sewer and traffic hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review documents, plan the work and monitor site changes
- Establish site, traffic and access controls
- Locate and expose existing services
- Position plant and complete pre-start checks
- Excavate trenches and manage spoil
- Prepare trench bases and bedding
- Install water and sewer pipes
- Install gas service pipework
- Pressure test and disinfect lines
- Inspect the installation and obtain required approvals
- Backfill, compact and reinstate the site
- Respond to service, excavation and exposure emergencies
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out external water, sewer and gas work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review documents and plan work |
|
| Establish site and traffic controls |
|
| Locate and expose services |
|
| Position plant and conduct pre-start |
|
| Excavate trench and manage spoil |
|
| Prepare trench base and bedding |
|
| Install water and sewer pipes |
|
| Install gas service pipework |
|
| Pressure test and disinfect lines |
|
| Inspect and obtain approvals |
|
| Backfill and compact trench |
|
| Reinstate site and demobilise |
|
| Respond to emergencies |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: How to Manage Work Health and Safety Risks (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Construction Work (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Excavation Work (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing Risks of Plant in the Workplace (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Confined Spaces (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Hazardous Manual Tasks (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing the Risks of Hazardous Chemicals in the Workplace (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work (guidance only; confirm adoption in the relevant jurisdiction).
- AS/NZS 3500 Plumbing and drainage series.
- AS/NZS 5601.1 Gas installations.
- AS/NZS 4645 Gas distribution networks.
- AS 4744.1 Steel shoring and trench lining equipment.
- AS 1319 Safety signs for the occupational environment.
- AS 1742.3 Manual of uniform traffic control devices, Part 3: Traffic control for works on roads.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment.
- AS/NZS 1716 Respiratory protective devices.
- AS/NZS 2210.3 Protective footwear.
- AS/NZS 4602.1 High visibility safety garments.
- AS/NZS 1270 Hearing protectors.
- AS/NZS 1801 Occupational protective helmets.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80