
Fixed Scaffolding Erection and Dismantling SWMS
- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content – Ready to Deploy Immediately
- Customisable – Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Two Ways to Get Started
Upload your logo and company details — we'll customise all your documents automatically.
Download the Word template and edit directly.
Product Overview
This Fixed Scaffolding Erection and Dismantling SWMS is a comprehensive, ready-to-use safety document designed to identify hazards and implement effective controls for scaffolding work on Australian worksites. Covering all key stages of scaffold planning, erection, alteration and dismantling, it supports WHS compliance and safer management of High Risk Construction Work involving fixed scaffolds.
Activities & Specific Tasks Covered
This document includes specific risk controls for:
- Planning and authorisation of fixed scaffolding erection, alteration, height changes and dismantling activities
- Erecting fixed scaffold bays, standards, ledgers, transoms and bracing in accordance with design and manufacturer instructions
- Complicated scaffold setup, including multi-level, façade, lean-to and transom scaffold configurations
- Erecting temporary working platforms, hop-ups and access platforms to maintain safe and continuous access
- Adjusting scaffold levels to maintain correct platform heights, clearances and step heights between lifts
- Assessing scaffold lifeline security, anchorage points and fall-arrest systems before and during use
- Safe climbing on scaffold components, ladders and stair systems while maintaining three points of contact
- Preventing unsafe practices such as climbing on guardrails, ledgers or other non-designated access components
- Managing the risks of leaning out from scaffolds and overreaching when working at height
- Operating industrial scaffolding systems, including inspection of couplers, planks, ties and access equipment
- Positioning scaffolding near overhead and underground power lines, including exclusion zones and consultation with the electrical supply authority
- Control measures to prevent scaffold tilting, collapse or unplanned movement through correct tying, bracing and foundation preparation
- Housekeeping, exclusion zones and traffic management around the scaffold during erection and dismantling
- Inspection, tagging, maintenance and removal from service of damaged or non-compliant scaffold components
- Emergency response planning for falls from height, structural failure and other scaffold-related incidents
Who is this for?
This SWMS is designed for scaffolders, construction contractors, builders, industrial maintenance crews and site supervisors responsible for the erection, alteration and dismantling of fixed scaffolding systems.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning and consultation |
|
| Site inspection and preparation |
|
| Establish exclusion zones and services checks |
|
| Delivery and stacking of scaffold components |
|
| Base setup and prevention of scaffold tilting |
|
| Erecting first lift and fixing ties |
|
| Working at height during erection |
|
| Decking, planking and toe board installation |
|
| Guardrails, access and temporary platforms |
|
| Complex and high scaffolding configurations |
|
| Use of scaffolding for elevated work |
|
| Inspection, maintenance and repair |
|
| Training, supervision and worker competency |
|
| Dismantling and removal of scaffold |
|
Need to add specific site requirements?
Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- Safe Work Australia – Construction Work Code of Practice: Guidance on managing risks associated with construction work, including scaffolding and work at height.
- Safe Work Australia – Managing the Risk of Falls at Workplaces Code of Practice: Requirements and controls for preventing falls from, on or through scaffolds and other elevated work areas.
- Safe Work Australia – Managing Electrical Risks in the Workplace Code of Practice: Controls for working near overhead and underground electric lines when positioning and using scaffolding.
- Safe Work Australia – Managing Risks of Plant in the Workplace Code of Practice: Risk management principles for scaffolding as plant on construction and industrial sites.
- AS/NZS 1576 Scaffolding (series): Performance, design and use requirements for scaffolding systems and components.
- AS/NZS 4576 Guidelines for Scaffolding: Practical guidance on safe erection, alteration, use, inspection and dismantling of scaffolds.
- AS/NZS 1891 Industrial Fall-Arrest Systems and Devices (series): Requirements for harnesses, lanyards, anchorages and lifelines used with scaffolding work.
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
Standard SWMS Features (Click to Expand)
- Operational guidelines, with a step-by-step approach to safe work
- Possible hazards that may be encountered
- Step-by-step safety procedures to follow
- Before work starts – Guidelines and Checks
- Safety measures and guides
- Operational Safety Checks
- Before and After Risk Ratings
- Risk Assessment Matrix
- High Risk Work Involved
- Emergency Evacuation Procedure
- Plant and Equipment
- Qualifications and Permits
- Specific Personal Protective Equipment (PPE)
- Company Personnel Sign-off form
Suitable for Industries
$96.8
Includes all formats + 2 years updates

Fixed Scaffolding Erection and Dismantling SWMS
- • 100% Compliant with Australian WHS Acts & Regulations
- • Fully Editable MS Word & PDF Formats Included
- • Pre-filled Content – Ready to Deploy Immediately
- • Customisable – Easily Add Your Logo & Site Details
- • Includes 2 Years of Free Compliance Updates
Fixed Scaffolding Erection and Dismantling SWMS
Product Overview
This Fixed Scaffolding Erection and Dismantling SWMS is a comprehensive, ready-to-use safety document designed to identify hazards and implement effective controls for scaffolding work on Australian worksites. Covering all key stages of scaffold planning, erection, alteration and dismantling, it supports WHS compliance and safer management of High Risk Construction Work involving fixed scaffolds.
Activities & Specific Tasks Covered
This document includes specific risk controls for:
- Planning and authorisation of fixed scaffolding erection, alteration, height changes and dismantling activities
- Erecting fixed scaffold bays, standards, ledgers, transoms and bracing in accordance with design and manufacturer instructions
- Complicated scaffold setup, including multi-level, façade, lean-to and transom scaffold configurations
- Erecting temporary working platforms, hop-ups and access platforms to maintain safe and continuous access
- Adjusting scaffold levels to maintain correct platform heights, clearances and step heights between lifts
- Assessing scaffold lifeline security, anchorage points and fall-arrest systems before and during use
- Safe climbing on scaffold components, ladders and stair systems while maintaining three points of contact
- Preventing unsafe practices such as climbing on guardrails, ledgers or other non-designated access components
- Managing the risks of leaning out from scaffolds and overreaching when working at height
- Operating industrial scaffolding systems, including inspection of couplers, planks, ties and access equipment
- Positioning scaffolding near overhead and underground power lines, including exclusion zones and consultation with the electrical supply authority
- Control measures to prevent scaffold tilting, collapse or unplanned movement through correct tying, bracing and foundation preparation
- Housekeeping, exclusion zones and traffic management around the scaffold during erection and dismantling
- Inspection, tagging, maintenance and removal from service of damaged or non-compliant scaffold components
- Emergency response planning for falls from height, structural failure and other scaffold-related incidents
Who is this for?
This SWMS is designed for scaffolders, construction contractors, builders, industrial maintenance crews and site supervisors responsible for the erection, alteration and dismantling of fixed scaffolding systems.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning and consultation |
|
| Site inspection and preparation |
|
| Establish exclusion zones and services checks |
|
| Delivery and stacking of scaffold components |
|
| Base setup and prevention of scaffold tilting |
|
| Erecting first lift and fixing ties |
|
| Working at height during erection |
|
| Decking, planking and toe board installation |
|
| Guardrails, access and temporary platforms |
|
| Complex and high scaffolding configurations |
|
| Use of scaffolding for elevated work |
|
| Inspection, maintenance and repair |
|
| Training, supervision and worker competency |
|
| Dismantling and removal of scaffold |
|
Need to add specific site requirements?
Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- Safe Work Australia – Construction Work Code of Practice: Guidance on managing risks associated with construction work, including scaffolding and work at height.
- Safe Work Australia – Managing the Risk of Falls at Workplaces Code of Practice: Requirements and controls for preventing falls from, on or through scaffolds and other elevated work areas.
- Safe Work Australia – Managing Electrical Risks in the Workplace Code of Practice: Controls for working near overhead and underground electric lines when positioning and using scaffolding.
- Safe Work Australia – Managing Risks of Plant in the Workplace Code of Practice: Risk management principles for scaffolding as plant on construction and industrial sites.
- AS/NZS 1576 Scaffolding (series): Performance, design and use requirements for scaffolding systems and components.
- AS/NZS 4576 Guidelines for Scaffolding: Practical guidance on safe erection, alteration, use, inspection and dismantling of scaffolds.
- AS/NZS 1891 Industrial Fall-Arrest Systems and Devices (series): Requirements for harnesses, lanyards, anchorages and lifelines used with scaffolding work.
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
Standard SWMS Features (Click to Expand)
- Operational guidelines, with a step-by-step approach to safe work
- Possible hazards that may be encountered
- Step-by-step safety procedures to follow
- Before work starts – Guidelines and Checks
- Safety measures and guides
- Operational Safety Checks
- Before and After Risk Ratings
- Risk Assessment Matrix
- High Risk Work Involved
- Emergency Evacuation Procedure
- Plant and Equipment
- Qualifications and Permits
- Specific Personal Protective Equipment (PPE)
- Company Personnel Sign-off form
$96.8