“`html
Introducing the Safe Work Method Statement Template for Equipment Assembly and Installation, your handy mate when it comes to ensuring that all safety aspects on-site are covered. Created with attention to detail, this template is designed to help you put together a comprehensive plan without the fuss and bother. Let’s look at how this tool can be part of making your workplace safer:
Pre-filled and Comprehensive
This template comes pre-filled with essential steps, potential hazards, and control measures that suit most equipment assembly and installation projects. It’s a solid foundation to get you started without scratching your head over what to include.
Fully editable and customisable in Microsoft Word format for easy editing
The template is as flexible as a goanna’s tail – open it in Microsoft Word and tweak away. Add your site’s specifics, adjust details, and fit it perfectly to your needs. No IT degree required!
Includes the scope of the project and the project details
Capture every aspect of your project in one place. Outlining the scope and key details within the template helps keep everyone’s eyes on the prize.
Includes checklist of any high risk machinery on site
There’s a space just for listing high-risk machinery you’ve got in the mix. This way, everyone knows what’s on-site and can be extra cautious around those bits of kit.
Includes space for recording any staff training
Your team’s skills are crucial. Record all staff training sessions related to the job, so there’s no question who’s trained and ready to tackle the equipment safely.
Includes before and after risk ratings
Assess risk levels both before and after implementing controls. This feature lets you easily showcase the positive impact of safety measures.
Includes resources for use of legislative references
Compliance should never be guesswork. We’ve thrown in references to relevant legislation, providing a resource point so you can double-check that all your bases are covered.
Includes all PPE required
No one should be on-site without proper gear. The template lists the necessary Personal Protective Equipment (PPE) so you don’t miss out on any vital pieces of kit.
Includes risk assessment and risk assessment matrix
Tackle risks head-on with a structured process. Our template includes a straightforward risk assessment along with a handy matrix to visually map out potential issues versus their likelihood and severity.
Includes a checklist to ensure all requirements have been covered when implementing the SWMS
A quick checklist guides you through the SWMS implementation process, helping you tick off items as they are addressed to ensure nothing falls through the cracks.
Includes sign off page for all workers and responsible persons
Saves space for every worker and responsible person on the job to sign off, confirming what’s been read, understood, and applied — because accountability matters.
Easy to use, easy to customise
We reckon simplicity is key. The template’s structure is intuitive, making it user-friendly even if you’re not the world’s leading expert on safety documentation.
Suitable for large contracts and Tenders, including tier 1 contractual work
Good for the small jobs and the big fish too. Whether you’re working on a smaller project or something grander like a tier 1 contract, this template adapts to both ends of the scale.
Quick delivery by email
No need to wait by the postbox. As soon as you’re ready, we send the template directly to your inbox, ready for action. A few clicks and you’re underway!
With our Safe Work Method Statement Template for Equipment Assembly and Installation, you’ll take a step towards safeguarding yourself and your crew. Although it’s a guide, always consult with qualified personnel to ensure compliance with local regulations and personal safety requirements. Happy and safe working!
“`
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Equipment Assembly and Installation Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


